![FLIR 00723193774298 Installation & Operation Instructions Download Page 25](http://html.mh-extra.com/html/flir/00723193774298/00723193774298_installation-and-operation-instructions_2305717025.webp)
4.4 Cable ferrite installation
Your product is supplied with a cable ferrite. To
ensure EMC Compliance, the supplied ferrite must
be fitted to the cable according to the following
instructions.
S
ea
Ta
lk
ng
50 mm (1.97 in) - 100 mm (3.94 in)
SeaT
alkng
Device
D13539-1
1. The ferrite must be fitted to the end of the cable
closest to the device.
2. The ferrite must be fitted at the distance specified
in the illustration above.
3. Ensure a tight and secure fit so that the ferrite will
not move up or down the cable.
4.5 SeaTalk
ng®
connection
The unit connects as part of a
SeaTalk
ng
network.
Example: SeaTalk
ng®®
system with Evolution
autopilot and iTC-5
12 V dc
0
0
SeaT
alk
ng
SeaTalk
ng
D13026-2
7
1
3
2
4
5
6
8
9
1
0
1
1
1
ACU unit
2
i70s
Multifunction instrument display
3
p70s
/
p70Rs
Pilot controller (p70s shown)
4
Vessel’s 12 V dc power supply
5
EV unit
6
SeaTalk
ng
5–way connector
7
Rudder reference transducer
8
iTC-5
converter
9
Depth transducer
10
Wind transducer
11
Speed transducer
Note:
In the above example if an
ACU-100
were
used, the
SeaTalk
ng
network would require a
dedicated 12 V dc power supply because the
ACU-100
does not supply power to the
SeaTalk
ng
network.
Cables and connections
25
Summary of Contents for 00723193774298
Page 2: ......
Page 4: ......
Page 10: ...10 p70s p70Rs ...
Page 14: ...14 p70s p70Rs ...
Page 28: ...28 p70s p70Rs ...
Page 40: ...40 p70s p70Rs ...
Page 50: ...50 p70s p70Rs ...
Page 60: ...60 p70s p70Rs ...
Page 70: ...70 p70s p70Rs ...
Page 76: ...76 p70s p70Rs ...
Page 82: ...82 p70s p70Rs ...
Page 96: ...96 p70s p70Rs ...
Page 112: ...112 p70s p70Rs ...
Page 120: ...120 p70s p70Rs ...
Page 123: ......