3.1 Installation checklist
Installation includes the following activities:
Installation Task
1
Plan your system.
2
Obtain all required equipment and tools.
3
Site all equipment.
4
Route all cables.
5
Drill cable and mounting holes.
6
Make all connections into equipment.
7
Secure all equipment in place.
8
Power on and test the system.
Schematic diagram
A schematic diagram is an essential part of planning
any installation. It is also useful for any future
additions or maintenance of the system. The
diagram should include:
• Location of all components.
• Connectors, cable types, routes and lengths.
3.2 Parts Supplied
The following parts are supplied with your product.
D13418-2
4
2
6
1
3
5
7
x
4
1.
Documentation
2.
Panel seal gasket
3.
400 mm (15.7 in)
SeaTalk
ng
spur cable (A06038)
4.
p70s
or
p70Rs
Pilot controller (p70s shown)
(supplied with keymat and black bezel (A80353)
fitted)
5.
Suncover (
p70s
= A80357,
p70Rs
= A80358)
6.
Spare gunmetal bezel (A80354)
7.
Mounting fixings x 4
Unpack you product carefully to prevent damage or
loss of parts, check the box contents against the list
above. Retain the packaging and documentation for
future reference.
16
p70s / p70Rs
Summary of Contents for 00723193774298
Page 2: ......
Page 4: ......
Page 10: ...10 p70s p70Rs ...
Page 14: ...14 p70s p70Rs ...
Page 28: ...28 p70s p70Rs ...
Page 40: ...40 p70s p70Rs ...
Page 50: ...50 p70s p70Rs ...
Page 60: ...60 p70s p70Rs ...
Page 70: ...70 p70s p70Rs ...
Page 76: ...76 p70s p70Rs ...
Page 82: ...82 p70s p70Rs ...
Page 96: ...96 p70s p70Rs ...
Page 112: ...112 p70s p70Rs ...
Page 120: ...120 p70s p70Rs ...
Page 123: ......