4.5 Commissioning
Survey the following steps before energizing the instrument.
•
Mechanical installation, grounding, load cell connection and power supply
connection.
•
The T and R pins on the instrument shall be defined the analogue output
•
The analogue output cabling should be done for the same analogue output
type.
•
The adjustment rotary switches shall be at
“
0
“ position at power on.