background image

 

16 

 

H. Kamerlingh Onnesweg 2 

2408 AW Alphen aan den Rijn 

The Netherlands 

 

 

CONFIDENTIAL   -   THIS DOCUMENT MAY NOT BE DISCLOSED TO ANY THIRD PARTY OR USED FOR ANY 
OTHER PURPOSE WITHOUT THE EXPRESS WRITTEN PERMISSION OF AV FLEXOLOGIC BV
 

CONFIDENTIAL 

 

 

 

 

 

Every time a MOM file is imported a new job is created. Not all fields in the imported job may be filled in 
correctly. The fields which are not present in the MOM file will be filled in with the default values.  
These default values are the same as when a new job is created manually. 

If these default values are not the correct values for this job, they need to be changed before you can start 
mounting. The values which might need changing after import are: 

Field name 

Description 

Cylinder width 

With of the to be used cylinder/sleeve 

Cylinder repeat 

The repeat of cylinder /sleeve including buildup 

Tolerance 

The accepted mounting tolerance 

Check tolerance 

The accepted check tolerance for OK or NOK  

Press overshoot 

Additional press distance to press down the entire cliché 

Plate data 

Name of plate type selected 

Tape data 

Name of tape type selected 

Remarks 

Will indicate this was an imported job 

 

19.

 

External job creation 

Besides the usage of plug-in software, it is possible to have an additional PC dedicated for entering jobs. 
This PC is also known as the Offline Filling Database (OFD). 

While entering jobs manually into the FAMM with the OFD, the FAMM can still mount simultaneously. 
Both computers are connected via a network cable and share the database containing the jobs.  
The OFD computer is dedicated for creating jobs and cannot control the FAMM. 

There are 2 different ways to implement this system: 

Option 1 

The image below shows the so-called ‘stand-alone’ solution. 

The FAMM is connected to the OFD using a cross-link Ethernet cable. 

Jobs are stored on 1 of the computers, preferably the FAMM computer, and the other computer has access 
through the Ethernet connection. The computer which holds the jobs must be switched on for the other 
computer to reach them. This is why it is preferred to locate the jobs on the FAMM computer. 

 

As in MOM file 

After ‘hor. and vert. mirror’ 

Summary of Contents for FAMM

Page 1: ...BV CONFIDENTIAL User manual FAMM Full automatic mounting machine Summary This document is the user manual for the Full Automatic flexo plate mounting machine FAMM of AV Flexologic BV and explains the...

Page 2: ...17 ESKO graphics PlatepatcherTM 14 18 Importing a MOM file 14 19 External job creation 16 20 Non disclosure 17 1 Introduction This is the user manual for the Fully Automatic Mounting Machine FAMM a mo...

Page 3: ...please contact the service department of AV Flexologic at Support AVflexologic com 5 Tools list The following tools are required to operate the FAMM Please make sure the tools are available before st...

Page 4: ...ERMISSION OF AV FLEXOLOGIC BV CONFIDENTIAL 7 Press the blue or white RESET button After reset the light of the button will go off 8 The FAMM control software will automatically start up and show the m...

Page 5: ...hese buttons are for situations in which the FAMM needs to immediately stop all actions 1 In case of an emergency press an emergency stop button firmly The FAMM will immediately stop all actions Use o...

Page 6: ...machine is busy mounting No action is required When the light pillar flashes green the machine has finished and the sleeve is ready to swing out and be changed Operator assistance is required to cont...

Page 7: ...FLEXOLOGIC BV CONFIDENTIAL 9 Adding a new job This section describes how to create a new job on the FAMM operator terminal Step Action 1 Click on Add a job A and add a job name B job number C number...

Page 8: ...d a plate to a cylinder in the FAMM software Step Action 1 Find the cylinder you want to add a plate to in the job tree on the left and click on the next to the job name item number to open the job A...

Page 9: ...on 1 Select a job from the drop down menu 2 Check if the correct cylinder size is set in the job description 3 Open the safety fence 4 Place a cylinder 5 Close the safety fence 6 Click on X 7 DONE 12...

Page 10: ...mation General job information Set information Table with set information Mounting marks information Coordinate table with mounting marks sorted by sets Repeat marks information Coordinate table inclu...

Page 11: ...Close and Ok to continue automatic mode 4 DONE Comments 15 Microdots not recognized at mount position This section describes the microdots not being recognized by the FAMM at mount position Step Acti...

Page 12: ...OR USED FOR ANY OTHER PURPOSE WITHOUT THE EXPRESS WRITTEN PERMISSION OF AV FLEXOLOGIC BV CONFIDENTIAL 5 Use the control buttons to roughly position the red cross over the micro dot 6 Use the slider to...

Page 13: ...ands CONFIDENTIAL THIS DOCUMENT MAY NOT BE DISCLOSED TO ANY THIRD PARTY OR USED FOR ANY OTHER PURPOSE WITHOUT THE EXPRESS WRITTEN PERMISSION OF AV FLEXOLOGIC BV CONFIDENTIAL 8 Click on train target to...

Page 14: ...PDF plug in manual 17 ESKO graphics PlatepatcherTM The DTP software developed by ESKO graphics called Plate patcher has the possibility to generate MOM files which can be imported by the FAMM This sof...

Page 15: ...sts of three clich s positioned as shown below When No mirror is selected the job is created with the clich s positioned as shown below With Hor Mirror they are mirrored horizontally over a vertical a...

Page 16: ...onal press distance to press down the entire clich Plate data Name of plate type selected Tape data Name of tape type selected Remarks Will indicate this was an imported job 19 External job creation B...

Page 17: ...ic backups of the jobs 20 Non disclosure This document and all parts of this document including images drawings and schematics remain property of AV Flexologic BV and may not be distributed copied dig...

Reviews: