8
RBP1 Belt Positioner
Section 5 - Pre-Operation Checklist and Testing
• Run the conveyor for at least 15 minutes and confirm the belt is tracking properly.
• If belt is still mistracking too far to one side, increase the roller-to-belt contact pressure on the side
running off; if necessary, decrease contact pressure on the opposite side.
• Recheck that all fasteners are tight
• Apply all supplied labels
• Be sure that all installation materials and tools have been removed from the belt and conveyor area
5.1 Pre-Op Checklist
5.2 Test Run the Conveyor