
Page 5
Start-Up Instructions
The water softener should be installed with the inlet, outlet, and drain connections made in accordance with the
manufacturer’s recommendations, and to meet applicable plumbing codes.
NOTE:
The valve control may need to reset to the home position when it is powered up. If it does, the motor will
run and the display will read “UD SYNC” to show that it is synchronizing the upper drive. When this is complete,
the motor will stop and the display will show the time of day.
Press the extra cycle button and hold it for five seconds to trigger a manual regeneration and advance the
1.
valve to the first regeneration position. Pressing the extra cycle button while the unit is in a regeneration cycle
will cause the valve to advance to the next position.
Position the valve to backwash. Ensure the drain line flow remains steady for 10 minutes or until the water
2.
runs clear (see above).
Position the valve to the brine / slow rinse position. Ensure the unit is drawing water from the brine tank (this
3.
step may need to be repeated).
Position the valve to the rapid rinse position. Check the drain line flow, and run for 5 minutes or until the water
4.
runs clear.
Position the valve to the start of the brine tank fill cycle. Ensure water goes into the brine tank at the desired
5.
rate. The brine valve drive cam will hold the valve in this position to fill the brine tank for the first regeneration.
Replace control box cover.
6.
Put salt in the brine tank.
7.
NOTE: Do not use granulated or rock salt.
Summary of Contents for 7000SXT
Page 23: ...Page 23 Notes...
Page 24: ...Page 24 Powerhead Assembly 12 16 6 13 1 2 5 4 7 9 10 11 3 8 15 14 17 11 18 11 BR61501 7000SXT...
Page 39: ...Page 39 Injector Flow Data TR18755_REVB...
Page 40: ...Page 40 Meter Flow Data TR18753 Softener TR18688 Filter 41140 02_REVA...
Page 41: ...Page 41 Dimensions 41023_REVC...
Page 42: ...Page 42 Notes...