background image

PAGE 11

Help: 888-426-5001

QualityWaterForLess.com

7   ›I n I t I a l   s ta R t- u P

1)  Locate the center knob on the face of the Fleck 5600 Meter Valve and be sure that the notch in the knob says  

“In Serv.” If not, rotate the knob CLOCKWISE until “In Serv.” is visible (at about 9 O’Clock) 

2)  With one nearby softened faucet running in the COLD position, slowly open your bypass valve or 3-valve bypass 

to about ¼ open to allow the air trapped in the softener to escape via your running faucet. 

note: opening the 

bypass too quickly or too open may damage your softener or plumbing

3)  Allow the softener tank to slowly fill with water. After a few minutes, you will see a trickle of water coming from 

the cold water faucet. Allow the water to run slowly in this manner for an additional 5 minutes. Next, with the 
cold water faucet still running, gradually move your bypass valve to the fully open position. 

note: You may see 

some initial discoloration from the softened water – this is normal and should dissipate within the first 

40-50 gallons of water used.

 Turn off the running cold water faucet when the water runs clear

› C o n G R at u l at I o n s

Your new softener with Fleck 5600 Meter Valve is now properly installed and 
programmed! Please maintain your system by keeping the softener plugged-
in and always keep your brine tank filled with salt to at least above the water 
level. We appreciate your business, and hope that you enjoy years of trou-
ble-free softened water!

4) 

 

i                  

to test the integrity of your new system and all connections

,

 it is strongly encouraged that you 

perform a short form regeneration to check for leaks before service. 

Begin this process by adding approx-

imately 5 gallons of water/the amount of water needed to cover the brine grid into the brine tank. Start a regen-
eration by turning the timer wheel clockwise, let the regeneration run its full course to completion, and check 
the entire system for leaks. If you notice a leak originating from the drain line/connection

return to page 10

 to 

review preparing the drain connection. If you notice a leak originating from the brine line/connections, 

return to 

pages 9 and 10

 to review preparing the brine tank connection

5)  Now you may add 120-160 pounds of pellet, solar, or block salt to your brine tank. 

always keep your brine tank 

filled with salt to at least above the water level. 

You do not need to perform a regeneration immediately after 

installation as the new resin arrives at full softening capacity. Simply let your softener meter automatically trigger 
regenerations by tracking the water consumption 

Summary of Contents for 5600 Econominder

Page 1: ...Fleck 5600 Metered Water Softener Install ation Guide v1 0...

Page 2: ...nd LBS of Salt Tank size and Hardness level determines the Unit Capacity and lbs of Salt per Regeneration OUTLET INLET Job Number Model Number Mineral Tank Size Se t ting VALUE HARDNESS Grains per Gal...

Page 3: ...k 5600 Valve into your Home Page 9 Making the Brine Tank Connection Page 10 Making the Drain Connection Preface Thank you for your purchase of a new water softener with Fleck 5600 Meter Control Valve...

Page 4: ...re and both figures can be used interchangeably If you get a hardness level in PPM or mg L please divide this number by 17 1 to get Grains gpg Ex If your hardness is measured at 300 PPM take 300 17 1...

Page 5: ...6 Legs 5 Unit Capacity The Unit Capacity equates to your system s rated capacity based on your tank size and hardness level In the first column identify the section containing your softener tank size...

Page 6: ...ig u r e 6 a Fig u r e 6 B pre install ation Before assembly of your new system be sure that the following conditions have been met for the place ment of your system Level firm surface such as concret...

Page 7: ...B 3 Installing the fleck 5600 Valve 1 Using caution not to lift the riser tube remove the filling funnel and tape While using the included silicone lubricant packet lubri cate the inner and outer o r...

Page 8: ...nes and use a wet rag on the lines being soldered to prevent heat damage during soldering 6 Once all connections have been made place the system into bypass by either using your existing 3 valve bypas...

Page 9: ...o take this moment to prepare and insert the brine support grid determined from pages 4 and 5 Then pull the 474 Brine Float Assembly out of the brine well as shown in Figure 9 C 4 Next fix the 474 Bri...

Page 10: ...be evenly press on both sides of the grey ring surrounding the tube and pull out as shown in Figure 10 A i Be sure to recut the end of the tube each time you remove it to ensure a proper seal when the...

Page 11: ...installed and programmed Please maintain your system by keeping the softener plugged in and always keep your brine tank filled with salt to at least above the water level We appreciate your business a...

Reviews: