background image

ASSEMBLY – The Deluxe Playground 

ModEL X12103

Please note: The swing bay is an available 

option for residential use only

Summary of Contents for Deluxe X12103

Page 1: ...ASSEMBLY The Deluxe Playground Model X12103 Please note The swing bay is an available option for residential use only...

Page 2: ...T Climbing Pole 1 Piece U Roof 1 Piece V Stairs 1 Piece The Parts W x Ring Bolts 28 Pieces X Ring Nuts 28 Pieces Y 1 x 3 8 Platform Railing bolts 6 Pieces Z 1 5 x 3 8 Platform Railing Bolts 24 Pieces...

Page 3: ...around the pole Depending on the pole there will be 2 or 3 Attachment Rings There are two types of Poles Poles A B C and D will also have a bracket on the top to secure the roof to Poles E1 and E2 wil...

Page 4: ...ces bag may include more Z 1 5 x 3 8 Platform Railing Bolts 24 Pieces Y 1 x 3 8 Platform Railing bolts 6 Pieces AA 3 8 Platform Railing nuts 18 Pieces X Ring Nuts 28 Pieces HH 3 8 Washers 48 Pieces JJ...

Page 5: ...tioning and inserting 1 Bolt Z 2 Washer HH and 1 Nut AA into Platform Ring 32 high on Pole C to attach it to Platform F Have a person hold Pole C while attaching the last open corner of Platform F to...

Page 6: ...using 2 Ring Bolts W and 2 Ring Nuts X Repeat for Second Step Railing K Now Attach 1 Stair Railing K with Clamps EE and DD to Attachment Ring on Pole A 75 from the Ground Fasten Second Railing K with...

Page 7: ...sing 2 Ring Bolts W and 2 Ring Nuts X Repeat for other three ends of Slide Roof R STEP 3C Attach slide roof to poles B D Fasten the clamps on the Bottom sides of Slide Roof R to Attachment Rings on Po...

Page 8: ...between Poles C and D using 3 Bolts Z 6 Washers HH and 3 Nuts AA Order bolt washer step platform washer nut Do not tighten bolts until the end of step 5 important Do not tighten bolts until the end of...

Page 9: ...olt Z 2 Washers HH and 1 Nut AA Order bolt washer platform ring washer nut Attach Pole E2 on the open corner that is on the same side as Pole D with 1 Bolt Z 2 Washers HH and 1 Nut AA Order bolt washe...

Page 10: ...g Nuts X STEP 6B Attach Railing J to Platform F1 Place Railing J between Poles A and B and fasten Clamp pieces EE and DD to the Attachment Rings at 75 from the ground on Pole A and Pole B Attach botto...

Page 11: ...Spinning Bead Wall to Platform F2 Fasten the clamps on the top of Wall P1 to Attachment Rings on Poles C and E1 that are 86 5 from the ground Insert 3 Bolts Z 3 Washer HH through Second Platform F fro...

Page 12: ...round Use 2 Bolt Y 4 Washer HH and 2 Nut AA Order bolt washer railing platform washer nut to secure Railing to Platform F2 STEP 8C Insert Climbing Pole T Loosen the Allen Key Bolt on the top piece of...

Page 13: ...ning Bead Wall to Platform F2 Fasten the clamps on the top of Wall P2 to Attachment Rings on Poles E1 and E2 that are 86 5 from the ground Insert 3 Bolts Z 3 Washer HH through Second Platform F from u...

Page 14: ...g Screw GG and 2 Short Self Tapping Screws FF at each post through the brackets on the tops of Posts A B C and D and into the Plastic Roof important If people assembling roof are not tall enough you w...

Reviews: