GLEC-6 - Installation and maintenance
10
FläktGroup
DC-10087-GB 2018-01-03_R0
Specifications are subject to alteration without notice
2. Reattach motor and speed controller with mounting brackets.
Check that the motor height position is the same as it was.
Tighten bolts and screws.
3. Reattach standing skids, if they were removed. Lift the back
plate up, turn the standing skids to original position and reat-
tach the standing support screws.
4. Insert the impeller and tighten the end bolt.
5. Lift the front section back, insert all bolts and check the gap
and the overlap between inlet cone and impeller. Tighten all
bolts while following that the gap and the overlap are staying
stable.