- if the rivet is too fastened, it will result excessively deformed and hard to unscrew from the screw
plug gauge, in this case it is necessary to decrease the stroke
16) Check the setting-up of the nose-piece according to the step 8)
17) The tool, which is set up according to the methodology above
mentioned, is ready for riveting.
3. TOOL MAINTENANCE
For the maintenance of the tool it is necessary to disconnect it from the source of the
compressed air !!!
3.1. Daily maintenance
Before start working, pour on a daily basis several drops of oil (we recommend hydraulic oil HYSPIN
AWHM 32
CASTROL) to the air inlet of the tool, only if the lubricating equipment is not connected to the air
distribution. If the tool works continuously, it is necessary to disconnect the air hose from the main air
supply. This operation shall be carried out every 2-3 hours a day.
Check, that the air does not escape, otherwise, the damaged hose or joints must be replaced.
If the pressure regulator is not equipped with filter, blow-over the air hose, before you connect it to the tool,
so that you get rid off water and foreign matters. If the pressure regulator is equipped with a filter, dry it.
Check if there is a right nose-piece and screw-plug gauge corresponding to the dimension of the rivet and if
the all threads are fastened.
Check, if the holes for the air stream are free.
3.2. Weekly maintenance
Weekly maintenance means that the worn-out or dysfunctional parts are changed. Dismantle the nose-piece
and screw-plug gauge according to the chapter 2.4., 1) and 3). All dismantled parts should be cleaned and
visually checked – especially the screw-plug gauges and nose-piece. Dismantled parts should be
reinstalled according to the chapter 2.4., 5) to 7) including setting up according to the point 8).
3.3. Overhaul
The overhaul is carried out always after 500 000 strokes or once every three years. The whole tool should
be dismantled and all the sealings and worn-out parts must be changed. This must be done exclusively by
engineers or employee trained by the producer or supplier.
4. SPARE PARTS
4.1. Order
The spare parts must be ordered to producer or to the supplier:
The order must contain:
a) serial number of the tool
b) number of the spare part
c) number of pieces
d) name and address of your company
e) your tax number
15