YOUR GATE IS NOW READY TO HANG.
STEP 5) INSTALL CHAIN LINK.
Using
GATE ROD (C)
thread rod through one
end of the chain link, attach
CLIPS (E)
to rod
and then to Gate Frame. Make sure clips are
evenly spaced. Roll chain link across gate
frame, pull taut, determine if any chain
link needs to be removed.
You can do this
by twisting a row of links counterclockwise
to remove the excess (Dia. A).
Thread remaining
Rod (C)
through end, attach remaining
Clips (E)
to rod, then to gate frame.
NOTE:
If needed,
you can use channel locks or large pliers to
clamp the clips tighter onto the gate frame.
STEP 5
Install WIRE TIES (J) to top and bottom rail
of your completed gate frame.
Dia. A
STEP 6
Install
FRAME HINGES (K)
equal distance from top and bottom of your frame.
Now install
GATE LATCH (L)
on the opposite side of your frame.
Set your gate onto post hinges (not included) and tighten all nuts.
Congratulations, you have successfully installed your
FIT-RIGHT™ Chainlink Gate.
03-CL031619 9/18/14 Page 3
www.jewettcameron.com • 800-955-2879
©2012-2014 Jewett-Cameron Company • North Plains, OR •