background image

GATE OPENING

NOTE:

 The width of the GATE FRAME (Outside Dimension) is always 4” LESS than the

 (inside dimension) of the GATE OPENING

STEP 1

  Set GATE POSTS in cement at desired width.

NOTE: Maximum of 72” Gate Opening, (inside dimension)

unless installing a Double Drive Gate.

NOTE:

The GATE POSTS and POST HINGES are NOT INCLUDED.

You must buy the appropriate hinges and posts for your installation

STEP 2

  Cut HORIZONTAL SPREADER BARS (B) to

  correct width (see chart above), based on

  your GATE OPENING width.

STEP 3 

 Assemble GATE FRAME using SPREADER BARS (B)

that you just cut, and VERTICAL UPRIGHTS (A). Ensure gate

is square and the proper width.

Use SELF-TAPPING 

NOTE: 

SCREWS (F) to secure in each corner. 

(Hinge side of gate will have the

truss hook hole in the upper left corner, Latch side of gate will have the

truss hook hole in the lower right corner.)

STEP 4 

 Check again that gate frame is square

and the correct width (Gate Outside Dimension

is 4” less than the Inside Dimension of the

GATE OPENING). Install TRUSS WIRE (G, H & I):

Start at hinge side (top left) and hook the TRUSS WIRE

(H). Pull down to latch side (bottom right) and attach 

CORNER HOOK (G), tighten TRUSS WIRE CLAMP (I).

Trim off excess truss wire.

If you have:
24” GATE OPENING, then cut spreader bar to 8” long

36” GATE OPENING, thencut spreader bar to 20” long
42” GATE OPENING, then cut spreader bar to 26” long
48” GATE OPENING, then cut spreader bar to 32” long
54” GATE OPENING, then cut spreader bar to 38” long
60” GATE OPENING, then cut spreader bar to 44” long
64” GATE OPENING, then cut spreader bar to 48” long
72” GATE OPENING, no cutting is necessary

Note: For gate openings in between those shown above -

add 1” to spreader bar length for every additional inch.

EXAMPLE: 25” GATE OPENING - 9” long bar
                       37” GATE OPENING - 21” long bar

 

GATE OPENING

Reference Chart for Cutting

Horizontal Spreader Bars (B)

STEP 3

STEP 4

H

inge Side

La

tch Side

H

inge Side

La

tch Side

03-CL031619  9/18/14    Page 2

www.jewettcameron.com •  800-955-2879

©2012-2014 Jewett-Cameron Company •  North Plains, OR •  

Gate Frame

(4”  L E SS than G A T E  OPE NING )

Summary of Contents for CL 031619

Page 1: ......

Page 2: ...mension is 4 less than the Inside Dimension of the GATE OPENING Install TRUSS WIRE G H I Start at hinge side top left and hook the TRUSS WIRE H Pull down to latch side bottom right and attach CORNER H...

Page 3: ...aining Clips E to rod then to gate frame NOTE If needed you can use channel locks or large pliers to clamp the clips tighter onto the gate frame STEP 5 Install WIRE TIES J to top and bottom rail of yo...

Page 4: ......

Page 5: ...est d querre et que sa largeur est appropri e le diam tre ext rieur de la barri re doit tre 10 cm plus petit que le diam tre int rieur de l ouverture de barri re Posez le FIL RECOURB G H et I commenc...

Page 6: ...cadre de barri re Remarque En cas de besoin vous pouvez utiliser des pinces multiprises ou des pinces de grande taille pour serrer les attaches au cadre de barri re TAPE 5 Fixez les FILS D ATTACHE J a...

Page 7: ......

Page 8: ...refuerzo en la esquina superior izquierda mientras que el lado del pestillo tendr el orificio del gancho de esquina del alambre de refuerzo en la esquina inferior derecha PASO 4 Verifique nuevamente...

Page 9: ...la varilla y en el marco de la puerta NOTE Si es necesario puede usar alicates para filtros o pinzas grandes para fijar los sujetadores m s firmemente al marco de la puerta PASO 5 Instale los ALAMBRE...

Page 10: ...cours de la p riode de la garantie et que vous souhaitez obtenir des pi ces de rechange ou que vous avez des questions envoyez une r clamation l adresse suivante Jewett Cameron Company PO Box 1010 Nor...

Reviews: