14
INSTALL PREFINISHED TOE KICK
Carefully score toe kick at
desired height
1
2
Slide toe kick onto the mounting rails
and secure
Do not over tighten the screws.
Snap smooth edges.
Snap both end tabs.
4
3
SECURE TO CABINETRY VIA DRAWER REMOVAL (METHOD B)
5
6
Refit the drawer to the runners and
clip into place via both locking tabs.
Before refitting the drawers, ensure
the hoses are not twisted and all
latches are facing forward.
Measure toe kick height. Where
the toe kick meets the bottom
of the tub is the recommended
cut-off point.