![First Water FW-120-M Operation Manual Download Page 7](http://html1.mh-extra.com/html/first-water/fw-120-m/fw-120-m_operation-manual_2293919007.webp)
Operation Manual
FW-1200-M
© 2012
First Water Systems, Inc
pg. 5
3.2 Component Layout
Arrange components in the following order, flowing from source
water to water outlet:
1
Water Source
2
Source Water Hose with Silt Screen attached
3
Water Purification Unit
4
Clean Water Hose
5
Clean water distribution
6
Unfold Solar Panel and plug into charge port (FW-120-MS only)
3.4 Startup
•
Ensure filters are installed
•
Place Source Water hose in water source
•
Attach Clean Water hose to system outlet
•
Plug unit into 120 volt power source and select “Power On”
or
•
Operate off the charged internal battery by selecting “Power
On”
•
Confirm that UV Lamp is operating by inspecting UV
indicator light
Allow the system to run for 5 to 10 minutes prior to distributing
clean water. This will ensure all carbon particles are flushed and the
UV lamp has the proper contact time with water.