4
STEP 1:
Carefully remove all components from packaging. DO NOT DISCARD PACKAGING until all
water softener components and fittings have been located.
STEP 2:
Use clips and screws provided and attach bypass valve to the inlet/outlet of the control valve.
See figure 2 below.
STEP 3:
Place unit at desired installation position.
DO NOT plug into electrical outlet at this time
(see STEP 10 on page 6). DO NOT put salt into brine tank at this time (see STEP 18 on
page 6).
STEP 4:
Shut off water at main supply. Relieve pressure by opening nearest faucet. On private well
systems, turn off power to pump and drain pressure tank.
SHUT OFF POWER OR FUEL
SUPPLY TO WATER HEATER.
STEP 5:
Cut main supply line as required
to fit plumbing to inlet and outlet of bypass valve.
DO NOT
PLUMB INLET AND OUTLET BACKWARDS.
Piping should be supported. Do not apply
heat to any fitting attached to the bypass or control valve.
STEP 6:
Use the provided polyethylene tubing (
NO VINYL TUBING
) to run drain line from control valve
discharge fitting to floor drain or sump pit capable of handling the backwash rate of the
softener (refer to specifications and flow rate on page 10).
DISCHARGE END OF THE
DRAIN LINE MUST BE FIRMLY SECURED!
There must be an air gap at the end of the
drain line to prevent siphoning of waste water and meet plumbing code. Total length of drain
line should be 15’ or less. AVOID OVERHEAD DRAINS.
Installation Instructions
FIGURE 2: Top View of FSN Series
Control Valve with Bypass
OUTLET
TREATED
WATER
INLET
SOFTENED
& IRON FREE
WATER
WATER
ADAPTER CLIPS
& SCREWS
ADAPTER CLIPS
& SCREWS
BYPASS
INJECTOR
ASSEMBLY
BRINE VALVE
DRAIN CONNECTOR
VALVE COVER