5
Left Seat Rail
This portion of the assembly requires the Mainframe, 1x Left/1x Right Seat Rail, 2x M10x70mm
Bolt, 4x M10 Nylock Nut and 4x M10 Washer.
Note 2x M10x70mm bolt/spacer are pre-installed on the Seat Rails for your convenience.
Right Seat Rail
Left Seat Rail
M10x70mm Bolts, 2x and 4x Nylock Nut/
M10 Washer
.
Begin with Left Seat Rail and align using the
pre-installed M10x70mm Bolt as shown.
Secure from behind with M10 Nylock Nut and
M10 Washer.
Left Seat Rail
Step 3: Attaching Seat Rails to Frame
Right Seat Rail
Bungee Pulley
Bungee Shock Cord
Before installation of the Right Seat Rail, thread the
Bungee Shock Cord through the top of the Seat Rail,
around the Bungee Pulley and out the bottom as shown.
Once this is complete, repeat the same assembly proce-
dure as used on the (previous page) Left Seat Rail.
Seat Rail Attachment
Points
Next, align and secure lower attachment
points using M10x70mm Bolt, M10 Nylock
Nut and M10 Washers.
Summary of Contents for Evolution E-520
Page 1: ...Owners Manual ...