Proprietary and Confidential
Valve proving
Evacuation
The first step is the evacuation. The downstream valve is opened so any gas that was present in
between the valves is evacuated into the combustion chamber (to be then evacuated during
prepurge). The length of time the valve remains open may be adjustable but will normally be around
five seconds.
38
NORMALLY CLOSED
PRESSURE < SETPOINT
CLOSED
OPEN
Summary of Contents for BurnerPRO
Page 1: ...BURNERPRO TROUBLESHOOTING August 2020...
Page 2: ...Proprietary and Confidential Sequence diagram 2 Without valve proving Interrupted pilot...
Page 3: ...Proprietary and Confidential Sequence diagram 3 With valve proving...
Page 5: ...Proprietary and Confidential Terminal designations 5 Without valve proving...
Page 6: ...Proprietary and Confidential Terminal designations 6 With valve proving...
Page 47: ...THANK YOU...