13
®
INSTALLING THE YP PROGRAMMER MODULE
The YP programmer module plugs into the side of
the YB110 (YB230) chassis module and can only
be installed in one direction. DO NOT ATTEMPT
TO FORCE THE YP PROGRAMMER INTO
THE CHASSIS. Referring to the illustration on the
right, align the holes in the YP programmer hous-
ing with the posts located within the YB chassis.
Push the YP module into the chassis until the YP
module is flush with the YB housing.
If it is necessary to remove the YP programmer
module from the YB chassis, 2 slots are provided
on the top and bottom of the YP housing. A small
screwdriver can be used to ‘pop’ the programmer
from the chassis.
ELECTRICAL CHECKOUT
If either a ground or a short circuit is detected, it must be eliminated before the control is plugged
into the wiring base and power turned on.
Test the electrical field wiring for short circuits and grounds. The recommended method requires the
use of an ohmmeter set on its lowest resistance scale.
6.
Touch the meter probes together and calibrate accurately to ensure a reliable test.
7.
Disconnect the neutral wire (L2) from the control system at the power source. Clip one meter
test lead to the grounded green wire or to terminal E and with the other probe touch each other
terminal. At no time should the meters show continuity or read 0 ohms.
8.
Reconnect the neutral wire (L2) at the power source. Remove the test probe from the grounded
terminal and reconnect it to Terminal L2 in the wiring base. With the other probe, touch each
other terminal. It is normal to obtain a resistance reading on the meter at some terminals during
this test as there are resistive loads (coils, transformers, lamps, etc.) connected whose normal
DC resistance may be less than 5 ohms. However, at no time should the test meter read zero
ohms.
9.
With BurnerLogix installed, measure voltage from L2 to all other terminals. Reading should be
zero on all terminals except Ll.
INSTALL BURNERLOGIX INTO WIRING BASE
The BurnerLogix YB chassis/amplifier module contains 2 screws permanently retained into the top
and bottom of the housing. The wiring base contains two brass inserts with recessed threads to ease
the installation. Line up the printed circuit board spacer located in the YB chassis/amplifier module
with the alignment tabs located in the wiring base. Firmly push the YB model into the wiring base to
assure the connectors mate properly. Tighten the screws into the brass inserts until snug.
YB110
YP100
For installations requiring CE certification:
After installation, the equipment should be protected from general access by means of a cabinet
which is only accessible with a key or special tool and therefore a clear responsibility who
replaced the fuse. If the fuse is blown during installation or operation, the control must be sent to
the manufacturer to check.
CAUTION: Restore power for the following test.