![FireplaceXtrordinair ProBuilder 72 GSB2 Installation Manual Download Page 15](http://html1.mh-extra.com/html/fireplacextrordinair/probuilder-72-gsb2/probuilder-72-gsb2_installation-manual_2292034015.webp)
Installation
(for qualified installers only)
15
© Travis Industries
4/22/21 - 1458
PB 72 MV/GSB2/GSR2 Install
Standard vs. Extended Position
There are two positions that the standoff/heat shield assembly can be installed. The standoffs are shipped in the
standard (forward) position.
If the unit is installed in the standard position no modification is needed.
If the unit is being installed in the extended position, the standoff/heat shield assembly must be
repositioned back ½” (see illustration below).
NOTE: see pages 13 & 38.for additional details about standard vs. extended installations.