Fireplace Placement Requirements

Minimum Framing Dimensions

We recommend installing the 

shaded framing members 

after installing the chimney.  

Arrange the framing 

members so there is not a 

vertical member directly in 

the center of the opening 

where it would interfere with 

pipe clearances.

26"

Header

(install veritcally to 

ensure proper pipe to 

header clearance) 

A firestop is required at the top of 

the fireplace enclosure or ceiling 

level (whichever is lower).

Min. 4-1/2"

NOTE: make sure the 

enclosure is wide enough to 

accommodate the blower 

(see the section"Blower" for 

details).

The fireplace enclosure must not be 

less than 81" above the base of the 

fireplace.  

• If the fireplace is raised, the 

enclosure height must be raised to 

maintain the 81".

• Do not build into this area.  

• Do not slope the walls inward.  

• The header, vertical framing 

members, and all interior wall 

surfaces may protrude a maximum 

4" into this area.

50"

50-1/2"

The fireplace uses 1/2" standoffs on the back and sides and 4" stand-offs on the top to space the
fireplace away from framing members or walls.  These stand-offs may contact the framing members or
walls but do not place insulation or other material in the space between the stand-offs and fireplace.

AA

AA

AA

AA

AA

AA

AA

AA

AA

AA

AA

AA

AA

AAA

AAA

AAA

AAA

AAA

AAA

AA

AA

AA

AA

AA

AA

AA

AA

AA

AA

AA

AA

Travis Industries 
recommends the chase 
around the fireplace be 
insulated.  This insulation 
should only be placed 
between the framing 
members and secured so 
it does not fill the space 
between the fireplace and
standoffs.

Bend this bracket down 
on each side and nail it 
to the floor, securing the 
fireplace in position.

These lifting handles are 
removed (use a 7/16" wrench) 
once the fireplace is in place.

Standoffs (also 
located on back)

The fireplace (and 
firebox) must be made 
level and plumb during 
installation.  Use shims 
under the fireplace to 
properly level the 
fireplace.  

Zero 

Clearance 

Can

Firebox

WARNING:
Failure to correctly level and plumb 
this fireplace will lead to doors that 
swing open or closed.

AAA

AAA

AAA

AAA

AAA

AAA

AAA

The fireplace must be secured to the floor (use the lifting handle brackets - see illustration above).

Fireplace must be placed directly on wood or non-combustible surface (not on linoleum or carpet)

Summary of Contents for 44 Elite-ZC

Page 1: ...A AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA Zero Clearance Fireplace Listed Tested to U L 127 and portions of U L 1482 907 44 ELITE ZC INSTALLATIO...

Page 2: ...nts 7 Cooling Vents 8 Blower 9 Blower Duct Connection 9 Blower Electrical Connection 10 Chimney 11 Chimneys Part Numbers 11 Chimney Connection to Fireplace 11 Chimney Height 12 Special Chimney Require...

Page 3: ...quare feet up to 3 000 Will vary with the home s floor plan Maximum Burning Time Up to 12 Hours insulation and outside temperature BTU Output per Hour Cord Wood Method 10 700 to 76 700 A A AA A AA AA...

Page 4: ...includes allen wrench instructions Flex Duct w start collar 3 Length 6 Dia For Blower Two 10 Flex Ducts 7 Diameter For Cooling Vents Two Vent Hoods For Cooling Vents Two Vent Hood Storm Collars For C...

Page 5: ...space the fireplace away from framing members or walls These stand offs may contact the framing members or walls but do not place insulation or other material in the space between the stand offs and f...

Page 6: ...INSTRUCTIONS Clearances When installed walls in front of the fireplace must be a minimum 18 to the side of the faceplate or 15 1 2 from the side of the fireplace see the illustration on page 2 Firepl...

Page 7: ...brick river rock etc use the face being installed to create a template The fireplace is shipped with a set up face that is 1 16 larger on the top bottom and each side than the faceplate Leave the set...

Page 8: ...e fireplace recess the framing directly next to the fireplace See the illustration below 1 2 Drywall AAAA AAA1 2 Concrete Board 3 8 Tile Fireplace Overlapped Facing Framing 1 2 Drywall AAA AAAA 1 2 Co...

Page 9: ...AAAAAAA AAAAAAA AAAAAAA AAAAAAA AAAAAAA AAAAAAA AAAAAAA 23 Mantel may be combustible Minimum Mantel Clearance 20 18 in some cases Minimum Hearth Width 60 8 Min AAAAAA AAAAAA AAAAAAAAA AAAAAAAAA Combu...

Page 10: ...are two 12 lengths of vent use a connector and seal if adding more length The duct terminations must be located so they can not be blocked e g snow drifts Included with the fireplace is a set of stor...

Page 11: ...codes require a fire curtain in these cases Blower Duct Connection The blower may be placed in a ventilated crawl space if approved by the local building department AAAAAAAAAAA AAAAAAAAAAA The shorter...

Page 12: ...until it snaps in place AAA AAA Blower Conduit Snap this piece into the top of the blower housing White Common Junction Box Exposed Ground Black Hot Screw this piece into the junction box Use wire nut...

Page 13: ...en reposition the L brackets if necessary so they are directly adjacent the exterior of the chimney Use a drill with a 5 16 driver bit to re install the L brackets use the existing sheet metal screws...

Page 14: ...Space to Combustibles Rain Cap Storm Collar Flashing Firestop Between Floor Levels Attic Firestop with insulation shield Cooling Vent Depending on the manufacturer and where the chimney is to be insta...

Page 15: ...R gained from various chimney lengths when used with 30 elbows Make sure to add the amounts for both elbows Two sections may be added together to form a combined length For example 12 and 18 Temco ch...

Page 16: ...an 81 above the base of the fireplace If the fireplace is raised the enclosure height must be raised to maintain the 81 Do not build into this area Do not slope the walls inward The header vertical fr...

Page 17: ...4 16 1 2 x 24 3 4 10 12 16 x 23 3 4 16 x 25 1 2 16 1 2 x 24 1 4 16 1 2 x 26 11 12 16 x 25 16 x 26 3 4 16 1 2 x 25 1 2 16 1 2 x 27 1 4 12 12 16 x 26 1 8 16 x 28 1 8 16 1 2 x 26 5 8 16 1 2 x 28 5 8 Chi...

Page 18: ...ce decreasing efficiency and increasing emissions 1 Remove the set up face using a phillips screwdriver included with the faceplate Use a phillips screwdriver to remove the 12 screws holding the set u...

Page 19: ...rebox 6 If installing a catalyst temperature meter do so now see the instructions included with the temperature meter 7 The faceplate is packaged with the faceplate attachment screws Use a phillips sc...

Page 20: ...CIRCUIT IS ACTIVE Make sure the door is closed Attach the two male quick connects from the switch plate to the two female quick connects leading from the fireplace These male quick connects are for th...

Page 21: ...Replace these screws with the set screws included with the fireplace do not over tighten 13 7 8 44 Elite Door 44 A Door 15 Instructions for Adapting 44 A Doors to Fit 44 Elite Fireplaces a b Remove t...

Page 22: ...fireplace Adjustments are made to the door latch by moving the washers from either side of the door latch and tightening the inner nut against the outer nut The door latch is adjusted by moving washer...

Page 23: ...AND ABOVE IN AREA ABOVE FIREPLACE MAINTAIN 5 126 mm TO BACK 4 1 2 115 mm TO FRONT AND 18 1 2 470 mm CLEARANCE TO SIDES OF VERTICAL CHIMNEY MANTEL 23 585 mm TO EDGE OF FACEPLATE TOP FACING 12 305 mm T...

Page 24: ...ation 17 Facing Requirements 5 Features 1 Finalizing the Installation 16 Firebrick Placement 16 Fireplace Placement Requirements 3 Firestops 14 FMI Chimney 11 Framing Dimensions 3 Grate Placement 16 H...

Reviews: