Bay AG Installation
21
7. FASCIA ASSEMBLY & INSTALLATION
ATHENA WITH BAY DOOR
1
Remove screws fixed to lugs on firebox side.
2
Place pre assembled cast fascia against firebox and replace screw.
3
Remove 4 self tapping screws from below door opening and fit
ash hearth.
4
Fit lower grill over screws and tighten.
5
Set machine screw on top of bay section at approximately 30mm.
6
Place canopy lugs over the two 6mm screws in body and tighten.
7
The screw on the bay section may now require adjusting to support canopy.
8
Fit upper cast grill on side locaters.
9
Fit control knob
FORTE WITH BAY DOOR
1
Remove screws fixed to lugs on firebox side.
2
Place pre assembled fascia against firebox, position left hand slip
behind hinges and secure the screw. Place right hand slip against
fascia and secure.
3
Set the machine screw on the top of the bay section at approximately
30mm.
4
Place canopy lugs over the two 6mm screws in body and tighten.
5
The screw on the bay section may now require adjusting to support canopy.
6
Remove tape securing louvre.
7
Fit control knob.
Summary of Contents for Athena Bay AG
Page 1: ......
Page 4: ...Bay AG Installation 4...
Page 7: ...Bay AG Installation 7...
Page 8: ...Bay AG Installation 8 BUILT IN FIRE CANOPY INSTRUCTONS FOR NON MASONARY INSTALLATION...
Page 9: ...Bay AG Installation 9...
Page 10: ...Bay AG Installation 10...
Page 11: ...Bay AG Installation 11...
Page 12: ...Bay AG Installation 12...
Page 13: ...Bay AG Installation 13...
Page 14: ...Bay AG Installation 14...
Page 15: ...Bay AG Installation 15 Built In Fire Canopy Instructions...
Page 19: ...Bay AG Installation 19...
Page 20: ...Bay AG Installation 20...