background image

Bay AG Installation 

 

 

3.  BUILT IN FIRE CANOPY 

 

A Built In Fire Canopy is required if the fire is not being installed into a 
masonry fire place. 

For Built In Fire Canopy installations see the following pages 6,7,8,9,10,11,12,13,14. 

Summary of Contents for Athena Bay AG

Page 1: ......

Page 2: ...15 Cavity Chimney Termination Page 18 Insert Flue System for Masonry Fireplace Page 19 Minimum Height of Flue Outlet Page 20 Typical Insert Installation Diagram PAGE ITEM 3 1 Warnings 4 Firebox Fascia...

Page 3: ...AMMABLE LIQUIDS OR AEROSOLS IN THE VICINITY OF THIS APPLIANCE WHEN IT IS OPERATING Use caution when reloading with fuel Do NOT attempt to load fuel into the heater when the fire inside the stove is at...

Page 4: ...Bay AG Installation 4...

Page 5: ...OR PROTECTOR CONSTRUCTION An Insulated Floor Protector shall be a minimum thickness of 40mm consisting of 20mm of an approved insulation material i e 2 sheets of 10mm micorboard or superlux 10mm tile...

Page 6: ...lation 6 3 BUILT IN FIRE CANOPY A Built In Fire Canopy is required if the fire is not being installed into a masonry fire place For Built In Fire Canopy installations see the following pages 6 7 8 9 1...

Page 7: ...Bay AG Installation 7...

Page 8: ...Bay AG Installation 8 BUILT IN FIRE CANOPY INSTRUCTONS FOR NON MASONARY INSTALLATION...

Page 9: ...Bay AG Installation 9...

Page 10: ...Bay AG Installation 10...

Page 11: ...Bay AG Installation 11...

Page 12: ...Bay AG Installation 12...

Page 13: ...Bay AG Installation 13...

Page 14: ...Bay AG Installation 14...

Page 15: ...Bay AG Installation 15 Built In Fire Canopy Instructions...

Page 16: ...ial MANTEL Masonry Fireplace If the mantel shelf is of a combustible material there should be a minimum distance above the top of the fascia of 300mm This may be reduced if a deflector or heat shield...

Page 17: ...place 25mm white kaowool blanket supplied on top of casing 7 As this fire sources its combustion air from the chimney cavity enclosure the fire MUST be sealed around the front between the casing and t...

Page 18: ...chimney top The chimney plate must be weather sealed with silicone or mortar 4 Install chimney liner on top of the chimney plate 5 Ensure flue pipe is extended over the chimney liner by 180mm Secure...

Page 19: ...Bay AG Installation 19...

Page 20: ...Bay AG Installation 20...

Page 21: ...tighten 7 The screw on the bay section may now require adjusting to support canopy 8 Fit upper cast grill on side locaters 9 Fit control knob FORTE WITH BAY DOOR 1 Remove screws fixed to lugs on fire...

Page 22: ...WITSONS LIMITED Manufacturers of Lady Kitchener Contessa Coaster Bronte Viking Zealandia Royale Athena Forte Deco Plaza Aqualux 68 Austin Street PO Box 3231 HB Mail Centre Napier 4142 Phone 06 8438260...

Reviews: