P77-3 SC30 Manual 9.27.2019 Page 5
PACKING LIST
Primary Chamber Components
1
Primary Chamber w/ top & door assembly
including weight box with arms.
1
Connector Stack 3 foot tall, may be attached
to primary chamber
1
Toggle Clamp Ash door
3
Toggle Clamp Door
Stack Components
3
4’ x 18” Painted Steel Lined Stack section with
coupler for thermocouple
1
18” Stainless Steel Stack Cap
1
Secondary Burn Chamber
Burner & Hardware Gas
1
Upper Burner Midco Gas Burner
2
Lower Burner Midco Gas Burner
3
Burner Cover
Control Box
1
Control Panel, includes one or more of any of
following to meet customer needs
Digital Timer
Digital Temperature Control
Chart Recorder
(if ordered)
Lights, Switches, Breakers
Note: Counter weight material is supplied by factory and placed in fill box at end of door arms.
Sand or gravel is typical and weight used should be tuned to allow a slow rise of the door and
remain open on its own.
This incinerator must be assembled and connected to utilities by persons qualified to assure
proper operation. The Operator must read this manual and understand the operation and safety
before attempting use. Ash must be routinely removed by persons using proper protective
clothing like masks and glove. Only qualified service people are to adjust controls or install
components. Qualified is one who is engaged in, responsible for, or thoroughly familiar with
the permitting, installation and operation of incineration appliances, who is experienced in such
work and is familiar with the precautions required, and who will comply with all the
requirements of the Authority having jurisdiction over the installation. Refer to details in this
manual for other information.
Summary of Contents for P77-3-SC30
Page 3: ...P77 3 SC30 Manual 9 27 2019 Page 3 ...
Page 12: ...P77 3 SC30 Manual 9 27 2019 Page 12 ...
Page 28: ...P77 3 SC30 Manual 9 27 2019 Page 28 MIDCO BURNER J121 DS EXPLODED VIEW ...
Page 36: ...P77 3 SC30 Manual 9 27 2019 Page 36 ...
Page 37: ...P77 3 SC30 Manual 9 27 2019 Page 37 MIDCO BURNER INTERNAL WIRING ORANGE L1 ...
Page 38: ...P77 3 SC30 Manual 9 27 2019 Page 38 INCINERATOR WIRING DIAGRAM ...
Page 39: ...P77 3 SC30 Manual 9 27 2019 Page 39 ...
Page 40: ...P77 3 SC30 Manual 9 27 2019 Page 40 ...
Page 41: ...P77 3 SC30 Manual 9 27 2019 Page 41 LINKAGE DIAGRAM ...
Page 44: ...P77 3 SC30 Manual 9 27 2019 Page 44 ...
Page 45: ...P77 3 SC30 Manual 9 27 2019 Page 45 FDC Future Design Control Specification Review ...