
P77-3 SC30 Manual 9.27.2019 Page 49
TIP: When programming the chart over the thermocouple column
the red pen will respond to < and > pad keys, move red pen over
“K” and touch “3” on pad. You will see the blue pen slightly shift,
now you need to use the < and > pads to locate the blue pen over
“K”. Touch “3” on the pad and the chart will advance to next
column.
Summary of Contents for P77-3-SC30
Page 3: ...P77 3 SC30 Manual 9 27 2019 Page 3 ...
Page 12: ...P77 3 SC30 Manual 9 27 2019 Page 12 ...
Page 28: ...P77 3 SC30 Manual 9 27 2019 Page 28 MIDCO BURNER J121 DS EXPLODED VIEW ...
Page 36: ...P77 3 SC30 Manual 9 27 2019 Page 36 ...
Page 37: ...P77 3 SC30 Manual 9 27 2019 Page 37 MIDCO BURNER INTERNAL WIRING ORANGE L1 ...
Page 38: ...P77 3 SC30 Manual 9 27 2019 Page 38 INCINERATOR WIRING DIAGRAM ...
Page 39: ...P77 3 SC30 Manual 9 27 2019 Page 39 ...
Page 40: ...P77 3 SC30 Manual 9 27 2019 Page 40 ...
Page 41: ...P77 3 SC30 Manual 9 27 2019 Page 41 LINKAGE DIAGRAM ...
Page 44: ...P77 3 SC30 Manual 9 27 2019 Page 44 ...
Page 45: ...P77 3 SC30 Manual 9 27 2019 Page 45 FDC Future Design Control Specification Review ...