
P77-3 SC30 Manual 9.27.2019 Page 17
Thermocouples
Screw thermocouple in opening (apply never-seize on threads or similar antilocking
paste) and only hand tighten in port. Connect wires and conduit. Connection:
yellow wire to the + side
and
red wire
to the – side
.
Space conduit away from hot metal surfaces to prevent melting.
TIP: if controller shows SnSr or similar display the thermocouple is not wired proper,
the red or yellow wire failed, or the inner ceramic element is failed. To confirm the
controller is working shut off power to incinerator, put jumper wire across screws
where red/yellow attach to controller. If a temperature is now shown on the
controller it is good. Fix problem in thermocouple or its wires.
Summary of Contents for P77-3-SC30
Page 3: ...P77 3 SC30 Manual 9 27 2019 Page 3 ...
Page 12: ...P77 3 SC30 Manual 9 27 2019 Page 12 ...
Page 28: ...P77 3 SC30 Manual 9 27 2019 Page 28 MIDCO BURNER J121 DS EXPLODED VIEW ...
Page 36: ...P77 3 SC30 Manual 9 27 2019 Page 36 ...
Page 37: ...P77 3 SC30 Manual 9 27 2019 Page 37 MIDCO BURNER INTERNAL WIRING ORANGE L1 ...
Page 38: ...P77 3 SC30 Manual 9 27 2019 Page 38 INCINERATOR WIRING DIAGRAM ...
Page 39: ...P77 3 SC30 Manual 9 27 2019 Page 39 ...
Page 40: ...P77 3 SC30 Manual 9 27 2019 Page 40 ...
Page 41: ...P77 3 SC30 Manual 9 27 2019 Page 41 LINKAGE DIAGRAM ...
Page 44: ...P77 3 SC30 Manual 9 27 2019 Page 44 ...
Page 45: ...P77 3 SC30 Manual 9 27 2019 Page 45 FDC Future Design Control Specification Review ...