FireBird Envirogreen Combi HE Technical Manual Download Page 25

4

4

23

4.2 sliMline CoMBi - installeR guiDelines

Please note the following important points before 

commencing installation.
installation should only be carried out by a competent, 

qualified engineer, preferably oFteC registered and 

familiar with the installation of the Firebird boilers 

referred to in this manual.

WaRning

The manufacturer cannot accept responsibility for any 
damage to persons, animals or property due to error in 
installation or in the burner adjustment or due to improper 
or unreasonable use or non-observance of the technical 
instruction enclosed with the burner, or due to the 
intervention of unqualified personnel.

Positioning tHe BoileR

Compliance guide to part L now states that when installing 
a boiler on a new or existing system, the system should 
be cleaned, flushed and then protected with a suitable 
protection inhibitor. 
Ensure that adequate clearance is available for making the 
water and flue connections.
The boiler is serviced from the front and a clearance of 
750mm must be available at the front of the boiler.
No special hearth is required as the boiler is fully insulated, 
but the floor must be level and capable of supporting the 
weight of the boiler and its water content.
Sound levels must also be a consideration. Whilst Firebird 
condensing liquid fuel boilers are one of the quietest boilers 
on the market, some householders are particularly sensitive. 
a suitable corrosion inhibitor must be added to the 

heating system.

unDeRFlooR Heating

The boiler should not be directly connected to underfloor 
heating, as a minimum return temperature of 40˚C is 
required (it can be used with underfloor heating with 
adequate temperature controls to ensure return values are 
as stated above).

PlastiC PiPing

The boiler thermostat control and safety system is not 
designed, and must not be relied on, to protect plastic pipe 
from overheating. Plastic pipe must never be connected 
directly to the boiler and there must be at least 1 meter 
of copper pipe between the boiler and the first plastic 
connection. If you choose to use plastic pipe anywhere 
on your heating circuits, please consult the plastic pipe 
manufacturer for their instruction on how to ensure their 
product never overheats. Our boiler control and safety high 
limit thermostats are not designed to fulfil this function. 

Firebird accepts no responsibility for failure of plastic 

piping and fittings for whatever reason.

PRessuRiseD Heating systeM

The maximum operating working pressure is 2 bar when the 
system is at full operating temperature.

MagnetiC FiltRation

It is recommended at the time of installation of this boiler, 
to install a permanent effective magnetic filter on the return 
pipework after the last radiator on the central heating 
system. This will maintain maximum operational efficiency 
and protect the boiler from the damaging, long-term effects 
of “magnetite” (black iron sludge). It is essential that the filter 

is sized similar to the return pipework. The magnetic filter 
must be installed in accordance with the manufacturer’s 
instructions and serviced annually.

HaRD WateR - liMesCale

On initial fill, where it is suspected that there is a high 
concentration of scale products, a suitable inhibitor must 
be used to protect the boiler and system. Check with local 
water authorities if in doubt (max. 200 ppm).

PiPeWoRK

Do not obstruct flue fitting with Pipework.
Connect pipework as shown below.

Manual air vent

Pressure relief
valve

Automatic air vent

DHW flow

CH flow

CH return

Mains inlet

Filling loop
valves

DHW adjustable
mixing valve

Filling tHe systeM

The unit comes with a factory fitted expansion vessel. 
Should the total water volume of the system exceed the 
expansion provided, a second vessel should be added (see 
below table).

expansion vessel and system Requirements

Safety Valve Setting

3 bar

Initial System Pressure

0.5 bar

1.0 bar

1.5 bar

Total Water Content 

of System

Total Vessel Volume **

litres

litres

litres

litres

25

2.1

2.7

3.9

50

4.2

5.4

7.8

75

6.3

8.2

11.7

100

8.3

10.9

15.6

125

10.4

13.6

19.5

150

12.5

16.3

23.4

175

14.7

19.1

27.2

200

16.7

21.8

31.2

225

18.7

24.5

35.1

250

20.8

27.2

39.0

FOR FURTHER INFORMATION, CONSULT APPROPRIATE TRAININg 

MANUALS, BS 7074-1: 1989, EN 12828: 2012 + A1: 2014 AND ANy OTHER 

RELEVANT STANDARDS & REGULATIONS.

* * When calculating the size of any additional expansion          

vessel, remember to deduct the boiler expansion vessel volume 

of 12 litres from the calculated total system vessel volume 

required, as given in the above table.

Summary of Contents for Envirogreen Combi HE

Page 1: ...the householder once installation is complete Combi HE Combipac HE Slimline Combi HEATING SOLUTIONS ENVIRONMENT INNOVATION TECHNOLOGY Technical Manual Condensing BoileR C o m b i H E C o m b i p a c H...

Page 2: ......

Page 3: ...nd efficiency of all domestic central heating oil boilers Our boilers and burners are supplied as matched units Page 1 Safety 2 2 Standards Regulations 3 2 1 Condensate Disposal 4 2 2 Flue Regulations...

Page 4: ...ht following eye contact or prolonged reddening of the skin The small quantities of adhesives and sealants used in the product are cured They present no known hazards when used in the manner for which...

Page 5: ...Building Regulations To ensure the highest standards of installation safety it is important that the boiler be installed in compliance with the following regulations where applicable It is the respon...

Page 6: ...r in an unheated garage should not exceed 3 meters and Should be lagged with water proof insulation to prevent freezing Boiler Sealed Condensate Drain Discharge Pipe 75mm Soak Away Lime Stone Chipping...

Page 7: ...of the boiler on the base fixed to the casing of the boiler or mounted on the wall alongside the boiler Condensate pump wired in to come on with burner Inlet connected to condensate trap at base of bo...

Page 8: ...1 STANDARDS REGULATIONS Condensate Disposal Condensate Trap Fitting 1 Push washer into trap socket and screw trap onto boiler socket 2 Push flexible pipe onto trap socket 3 Final assembly Washer S S...

Page 9: ...Q R Pressure Jet Location Appliance Burner Type Condensing UK ROI NI A Directly below an opening airbrick opening window etc 1000mm 600mm B Horizontally to an opening airbrick opening window etc 1000m...

Page 10: ...ved for low level flue and low level balanced flue discharge when tested to BS EN 303 1 5 Terminating positions must be at least 1 8m distant from a fuel storage tank unless a wall with at least 30 mi...

Page 11: ...disperse vapours 3 The effect of the moisture generated must be considered in relation to the possible corrosion of metal parts it might reach and to the possible formation of ice on pathways in freez...

Page 12: ...ate System 35 flexible liner suitable for condensing applications System 35 adaptor 500mm Adjustable length Boiler adaptor Condensing boiler Condensing boiler NOTE All brick chimney constructions must...

Page 13: ...piers with a waterproof membrane between the piers of the tank Fuel storage tanks should not be sited within 1 8m of boiler flue outlets Do not allow household waste or hot ashes container in vicinity...

Page 14: ...ause Burner Lockout The boiler is factory fitted with a burner control box lockout safety feature which operates automatically if a fault occurs in the burner operation Should this occur the light on...

Page 15: ...uate temperature controls to ensure return values are as stated above PLASTIC PIPING The boiler thermostat control and safety system is not designed and must not be relied on to protect plastic pipe f...

Page 16: ...not allow the unit to exceed 1 bar while filling and a maximum of 2 bar when the radiators are at full operating temperature The automatic air vent will allow air to dispel from the boiler To remove a...

Page 17: ...ost protection It is also required to operate the post purge function on the burner when applicable If a permanent live supply is not provided the burner will not operate Permanent live Earth Neutral...

Page 18: ...d flue TOP mark Snorkel 1 Push the flap valve into the balanced flue air intake 2 Ensure that the flap valve is in the correct position 3 Push the snorkel hose over the flap valve and air intake and s...

Page 19: ...ls may not be sufficient to cope with plume dispersal from a condensing boiler 3 17 3 2 Combi HE Combipac HE INSTALLER GUIDELINES 90 terminal should be tilted up to prevent condensate droping from end...

Page 20: ...760 300 157 61 642 372 344 72 40 676 47 Model Envirogreen output range Weight kg Dimensions mm H W D A C E F G I J K M N Envirogreen Combipac HE 12 20kW 200 945 720 625 795 180 95 691 285 351 133 34...

Page 21: ...1 Heat deflector ACC000HTD ACC000HTD ACC000HTD 12 1 Air hose ACC000SSH ACC000SSH ACC000SSH 13 1 Flap valve ACC000FLP ACC000FLP ACC000FLP 14 1 Control panel ACP001CCE ACP001CCE ACP001CCE 15 1 Casing r...

Page 22: ...1 1 Heat deflector ACC000HTD ACC000HTD ACC000HTD 12 1 Flap valve adapter ACC000FVA ACC000FVA ACC000FVA 13 1 Flap valve ACCOOOFLP ACCOOOFLP ACCOOOFLP 14 1 Control panel ACP001CCP ACP001CCP ACP001CCP 15...

Page 23: ...ue Assembly 125 5 mm dia 125 5 mm dia 125 5 mm dia Max Low Level Flue Length 1 5m 1 5m 1 5m Max High Level Balanced Flue Length 6m 6m 6m Heating System Sealed Fit in accordance with BS 7074 Part 1 BS...

Page 24: ...perates automatically if a fault occurs in the burner operation Should this occur the light on the front of the burner will illuminate Press the reset button a maximum of two times If the boiler fails...

Page 25: ...ufacturer for their instruction on how to ensure their product never overheats Our boiler control and safety high limit thermostats are not designed to fulfil this function Firebird accepts no respons...

Page 26: ...ith a 5A fuse This appliance must be earthed A qualified electrician must carry out all electric wiring in accordance with current ETCI IET Regulations and any local regulations which may apply The bo...

Page 27: ...nced flue TOP mark Snorkel 1 Push the flap valve into the balanced flue air intake 2 Ensure that the flap valve is in the correct position 3 Push the snorkel hose over the flap valve and air intake an...

Page 28: ...760 147 325 80 Envirogreen Slimline Combi 20 26kW 168 855 520 600 760 147 325 80 A W H I D A C J Cut out 70x130 mm 770 730 750 780 65 45 80 120 135 Front View Side View Rear View Top View Central heat...

Page 29: ...ose ACC000FLX ACC000FLX 10 1 Stat pocket ACC001PKT ACC001PKT 11 1 Heat deflector ACC000HTD ACC000HTD 12 1 Air hose ACC000SSH ACC000SSH 13 1 Flap valve ACC000FLP ACC000FLP 14 1 Control panel ACP001CSL...

Page 30: ...125 5 mm dia Max Low Level Flue Length 1 5m 1 5m Max High Level Balanced Flue Length 6m 6m Heating System Sealed Fit in accordance with BS 7074 Part 1 BS 5449 OFTEC standards and all other relevant le...

Page 31: ...that the boiler is properly commissioned when first used u The boiler should be commissioned by a competent qualified engineer preferably OFTEC registered and familiar with Firebird products u The ins...

Page 32: ...es including the tubular baffles in the condensing section and clean them 2 Remove the condensate trap and clean it place a tray under the connection for the trap Vacuum out any loose debris from the...

Page 33: ...t be in accordance with a instruction technical manuals b all relevant standards and codes of practice 4 A competent qualified engineer preferably OFTEC registered using the correct installation and t...

Page 34: ...ace Heating Water Heating elmax kW elmin kW PSB kW ENVIROGREEN Combi HE 12 20kW A B 20 93 75 62 21 46 0 155 0 051 0 002 20 26kW A B 26 93 74 80 21 47 0 143 0 046 0 002 26 35kW A B 35 93 70 109 23 52 0...

Page 35: ......

Page 36: ...ts please contact Firebird Heating Solutions Ltd dar s Industrial Estate Baile Mhic re Co Cork P12 HK51 Ireland t 353 0 26 45253 f 353 0 26 45309 e info firebird ie web www firebird ie Firebird Heatin...

Reviews: