Version: August 2020
16
Step 6: Connect gas supply and commission
•
Gas installation, connection and commissioning must meet the requirements of AS/NZS 5601.1:2013
and be installed and certified by a suitably qualified person.
•
In order to access the gas supply and testing area, it is necessary to first remove the burner tray.
•
Remove the burner tray by following the
‘
Burner tray
removal process
’ in this guide.
•
Connect 3/8 soft copper pipe to main valve.
•
Leak test all joints.
•
Switch the appliance ON.
•
Test / adjust high pressure first (using the outer brass nut)
and then the low pressures against rating plate
specifications.
•
In the unlikely event that the rating plate is not attached,
Do Not
commission the appliance and contact The
Fire Dept immediately.
•
Switch the appliance OFF.
•
Install the burner tray by following the
‘Burner Tray Installation Process’
in this guide.
•
Switch the appliance ON.
•
Note
: due to lack of firebed, it may be necessary to manually light burners.
•
Switch the appliance OFF
• Lay firebed in accordance with instructions in Step 7 of this guide.
• Send gas certificate to appropriate person.