107
4
OPERATION AND USE
id.:
DB 260 REV. 00 01/07/2015
4.10.9.e Concrete unloading from drum emergency door
- Raise the drum but not necessarily to its maximum height.
- Visually inspect regular concrete unloading.
- To move on to the next area after completing unloading in the fi rst area, follow the instructions below:
- Lower the drum if it is still relatively full and reposition it on the longitudinal axis.
- Revert the drum rotation direction to mixing (clockwise).
- Approach and position in the new unloading area and follow all the instructions given above.
This operation must be performed by Authorised FIORI Workshops qualifi ed
personnel.
DANGER:
Summary of Contents for DB 260
Page 2: ......
Page 4: ......
Page 6: ......
Page 22: ......
Page 48: ...48 3 SAFETY PRECAUTIONS id DB 260 REV 00 01 07 2015 VEHICLE EXTERIOR ...
Page 110: ......
Page 166: ...166 TECHNICAL ANNEXES DB 260 REV 00 01 07 2015 id HYDRAULIC DIAGRAM ...
Page 168: ......
Page 174: ......
Page 175: ...2013 04 08 00 02 0796 Catalog Section 78 PowerView Model PV101 C User s Guide Version3 2 ...
Page 176: ......
Page 183: ...00 02 0796 3 2013 04 08 Faceplate Features ...
Page 221: ...00 02 0796 41 2013 04 08 NOTES ...
Page 222: ...NOTES ...
Page 223: ...NOTES ...
Page 226: ...www fwmurphy com PV101 ...