1.6 Notes for Installation on the Pipe
When installing the flow meter, one must follow the installation diagrams as shown
below. This will ensure the flow meter can guarantee the pipe is always filled with the
liquid: (
The figures below are only typical cases, which don’t include all feasible
installation methods. The user may judge the installation position based on the actual
condition.)
5m
No.
Diagram
Description
The sensor should be
installed at the pump outlet
rather than the inlet.
It should be installed at the
lower point and the vertically
upward point of the
horizontal pipe.
Don’t install it at the highest
point and the vertically
downward point of the pipe.
2
It should be installed at
the rising point of the
pipe.
If the pipe gap exceeds 5m,
the air release valve should
be installed at the
downstream of the sensor.
The downstream of the
sensor should have some
back pressure.
The control valve and cut
valve should be installed at
the downstream of the
sensor rather than the
upstream.
1
3
4
Summary of Contents for EPD36
Page 26: ...23 15 Ordering Information...
Page 39: ...3 1...
Page 40: ...4 2 2 1 7 2 2...
Page 42: ...6 3 2 7 4...
Page 43: ...7 5 5D 2D 1 100 PFA 150 6 5 S cm 7 40 70 5 95 of RH 86 106 KPa 24Vdc...
Page 46: ...10 9 2 3 PFA 1 ClF3 2 1 20 150 2 9 2 4 316L 9 2 5 IP67...
Page 48: ...12 11 11 1 5 D 2 D 11 2 11 3...
Page 49: ...13 11 4 11 5 a 10 b c 5 D D 2 D D d e f 400A m g h 10 10 5D 2D...
Page 50: ...14 i 30 D D j k PTFE PTFE l m n DN50 2mm DN65 DN150 3mm DN200 4mm o p q...
Page 51: ...15 11 6 1 2 3 5m 4 5 5m...
Page 52: ...16 11 7 1 6mm2 10 11 8 a 4...
Page 54: ...18 13 1 2 3 4 5 6 10 14 14 1 1 1 1 2 2 3 3 3 ENT ENT ENT ENT ENT ENT...
Page 55: ...19 14 1 1 14 1 2 Read Only ENT ENT 0 0000 m3 h 1274205 8 Liter L H 00 00 Bar...
Page 56: ...20 14 2 0 1 1 N A 2 1 N A 1 5 N A 1 4 N A 2 4 N A 3 1 N A 3 3 N A 1 9...
Page 64: ...28 14 3 1 2 3 4 5 OCC 6 CLR 7...
Page 66: ...30 15...
Page 67: ...31 16 20 70 80...
Page 68: ...32 17 7 1m s 10m s 10 28 RS 485 RS 485 12VDC NPN...