EN
41
• Install the wires (based on the AC connection type) respecting
the connections as indicated on the screw terminal block (L1=R
; L2=S ; L3=T).
ATTENTION –
A
Ensure that the cables are not twisted.
M4
1.5Nm
L1 N PE
L2
L3
T S R
ATTENTION –
A
In case of a wrong phase sequence the
inverter will not connect to the grid and it will provide an error
state.
• Re-install the screw terminal block inside the AC quick fit
connector and the ring on the cable gland.
Click
• Tighten the cable gland.
7.5Nm
ATTENTION –
A
Ensure that the cable jacket is inside the
connector cable gland.
ATTENTION –
A
Make sure the cable glands are properly
sealed to ensure to keep IP65 protection degree.
5.4.7 Connection of AC quick fit connector to
the inverter
• Pull out the protective cap from the AC output connector
(17)
.
Click
Click
• Connect the AC quick fit connector
(09)
to the AC output
connector
(17)
.
ATTENTION –
A
Push the connector till a double “click” will
be heared.
Click
Click
Click
Click
• Secure the AC quick fit connector.
Install and screw the holding clip.
ATTENTION –
A
The AC quick fit connector must not be
subject to tensile forces (examples: do not connect weights
to the AC cable, do not leave excess cable windings hanging,
etc).