Page 3
Assembly Procedure (ATVBK-3025-QR)
Step 1
Step 2
Normally, the sprayer will be mounted on an ATV with the
pump assembly at the operator’s back and the spray wand
will be at the rear of the unit. Right Hand (RH) and Left
Hand (LH) sides of the sprayer are determined as if you
are standing behind the sprayer, looking at it (facing
forward).
A phillips head screwdriver is required for this step.
(**) Mount tank brackets to the underside of the tank as
shown in Step 1. Use (4) flat head screws to secure it to
the tank. The tank will rest on the surface of the brackets.
Make sure the brackets are parallel with each other before
tightening down the bolts. Do not over-tighten.
Detail A
After your tank brackets are securely attached, turn the
tank assembly over and position it so that the cam handles
which extend beyond the back of the tank are facing you
and just hanging over the edge of the table or flat surface
you are assembling this on.
Secure the boom mounting brackets to the tank mounting
brackets with Cam handles as shown in Detail A. You can
position them as needed within the slot on the bracket. Just
be sure that the surfaces of both brackets are even with
each other.
You are now ready to mount this unit to an ATV, using
ratchet straps (NOT INCLUDED)
Step 3
Attach the boom to the boom mounting brackets with
the (2) u-bolts and (4) whiz locknuts. Make sure the u-
bolts are positioned within the grooves of the grommets
on the boom tube
NOTE: The purpose of these grommets is to pre-
vent metal-to-metal contact between the u-bolts,
boom tube and boom mounting brackets.
The grommets will ‘compress’ as you tighten the whiz
locknuts onto the u-bolts. Tighten just so that the boom
tube will NOT rotate within the grommets. Alternate the
tightening of the locknuts to provide even pressure on
the grommet.
**DO NOT OVER TIGHTEN the whiz locknuts, as
this may cause the boom tube to flatten slightly!