26-1135 Issue 1
10. Re-connect all existing cables to the appropriate terminals.
11. If the new additional zones are to be used straight away, connect the additional field wiring zone cables to
the relevant terminals on the TWINFLEX
®
pro panel CIE (they do not connect directly to the Expansion
Card). For details of how to connect the zone cables, see the TWINFLEX
®
pro Engineering &
Commissioning Manual.
12. Re-connect the mains power to the panel (before connecting the battery) by refitting the fuse in the fused
spur that supplies the panel or switching on the circuit breaker.
13. Now re-connect the battery.
14. Refit the right hand cover moulding (ensure the moulding engages properly into the CIE assembly
moulding) and secure into position.