background image

 
 

26-1135 Issue 1

 

 

10.  Re-connect all existing cables to the appropriate terminals. 

 

11.  If the new additional zones are to be used straight away, connect the additional field wiring zone cables to 

the relevant terminals on the TWINFLEX

®

pro panel CIE (they do not connect directly to the Expansion 

Card). For details of how to connect the zone cables, see the TWINFLEX

®

pro Engineering & 

Commissioning Manual. 
 

12.  Re-connect the mains power to the panel (before connecting the battery) by refitting the fuse in the fused 

spur that supplies the panel or switching on the circuit breaker. 

 

13.  Now re-connect the battery. 

 

14.  Refit the right hand cover moulding (ensure the moulding engages properly into the CIE assembly 

moulding) and secure into position. 
 
 

 

 

Summary of Contents for Twinflex pro 505-0006

Page 1: ...g one of the push on battery leads at the battery Always disconnect the battery first before removing the mains power to the panel NOTE Do not disconnect the battery by removing the wires from the terminals on the CIE circuit board Doing this may allow the batteries to short circuit 3 Remove mains power from the panel by removing the fuse in the fused spur that supplies the panel or switching off ...

Page 2: ... will only fit one way 8 Flip the left hand CIE assembly back over anti clockwise and plug the other end of the ribbon cable assembly into the connector marked expansion connector on the CIE PCB again this will only fit one way 9 Slide the CIE assembly onto the base moulding ensure that the CIE assembly moulding engages into the clips on the base moulding and that all cables ends are accessible fo...

Page 3: ...directly to the Expansion Card For details of how to connect the zone cables see the TWINFLEX pro Engineering Commissioning Manual 12 Re connect the mains power to the panel before connecting the battery by refitting the fuse in the fused spur that supplies the panel or switching on the circuit breaker 13 Now re connect the battery 14 Refit the right hand cover moulding ensure the moulding engages...

Page 4: ...te enable switch back to off when finished Technical Data For specifications of the TWINFLEX pro Panel when upgraded to 8 Zones please see the TWINFLEX pro Engineering Commissioning Manual Technical Support Contact your supplier for technical support on this product Due to the complexity and inherent importance of a life risk type system training on this equipment is essential and commissioning sh...

Reviews: