8
INSTALLATION
Before installing the machine, make sure that the machine has all the required conditions to
work correctly.
Therefore:
1
- Check that the electrical installation has all the conditions in order to work correctly.
1.1. - Check if the power supply corresponds to the one required for the machine (see the
ID plate);
1.2. - Check if there is a suitable earth circuit;
1.3. - Check if the available power is suitable for the machine power;
1.4. - The electrical board should have a protection of 30 mA and a circuit breaker with a
3mm separation from the contacts.
2
- Check that the water circuit has the required conditions for installation:
2.1. - A supply tap and a G3/8 pipe connection to connect to the supply pipe.
3
- Check that there is an accessible discharge pipe that can hold a pipe with ø16/17 mm.
4
- Place the machine correctly on the counter.
WORKING INSTRUCTIONS
In the water softener installation, the first procedure is to check if the water connection is done
in a proper way. If everything is alright with the water connection, turn on the main switch
(0/I)
and the green light will turn on, indicating that the water boiler is being automatically filled.
When the water boiler reaches the standard level, the orange light will turn off.
NOTE:
The preventive procedure of turning on the heating element switch only after turning off
the green pilot (water level) is only necessary when you’re doing an installation or a
repair service, in which it is necessary emptying completely the water boiler. In the
daily usage, you can turn on both switches at the same time, because the water boiler is
already filled.
“ALWAYS CONNECT THE GRILL DIRECTLY TO AN EARTHED MAINS SOCKET
AND NEVER USE ANY KIND OF TYPE T ADAPTERS.”
TO ASSURE A GOOD FUNCTIONING OF THE COFFEE MACHINE, IT IS
STRICTLY NECESSARY TO INSTALL A WATER SOFTENER, OBVIOUSLY
CONNECTED TO THE COFFEE MACHINE. IN THIS WAY, A BIGGER LIFE
EXPECTANCY AND A BETTER COFFEE QUALITY WILL BE GUARANTEED,
WITH LOWER MAINTENANCE COSTS.
GB