
23
MAINTENANCE SCHEDULE
Maintenance Schedule
Procedure
Before
Each Use
After
Each Use
Fittings/Hoses, Hydraulic
- Check for leaks/Tighten
Check for damage
Fittings, Zerk
- Grease (See lubrication points)
Oil, Hydraulic
- Check level
Hardware
- Check for tightness
Oil Cleanliness Requirements
NOTICE!
All hydraulic fluid shall be filtered before use in any FFC product to obtain the ISO
cleanliness standard of 17-14 or better, unless explicitly specified otherwise.
Lubrication Points
The following grease fittings should be greased before each use. See figure for locations.
1. Cylinders (2 fittings per cylinder)
2. Center Pin (2 fittings)
3. Ball Joint (B-Design, 1 fitting)
Summary of Contents for V-Snow Blade
Page 2: ...2 Notes...
Page 17: ...17 OPERATION figure 2 figure 3 Level Scoop Position Shown...
Page 24: ...24 MAINTENANCE RECORD Date Maintenance Procedure Performed Performed by Comments...
Page 34: ...34 HYDRAULIC ELECTRIC MANIFOLD SCHEMATIC...
Page 35: ...35 HYDRAULIC MANIFOLD SCHEMATIC...
Page 36: ...36 MOLDBOARD ASSEMBLY...
Page 41: ...41 NOTES...