Fetco HWD-2110 TOD User Manual Download Page 5

 

5

Operating Principles 
 

 

The dispense valve assembly mixes very hot tank water with cooler water to deliver precision temperature water 
at selected temperatures.  
 
When hot water is drawn from the faucet, the fill valve pulses on and off every few seconds to replenish the tank.   
 
By controlling the flow of incoming water, the amount of cold water entering the tank is synchronized with the rate 
at which the water can be heated. This ensures an uninterrupted supply of hot water.  
 
When dispensing water at a rate that exceeds the unit’s capacity to heat, the screen will show that the 
temperature is not available.   
 
If hot water tank supply is depleted during high use, faucet will temporary “lockout” to allow the hot water tank to 
reheat for an adequate hot water supply.  The “HEATING” screen will display at this time. 

 

 
 
       Cleaning & Maintenance 

 
Daily:  

  Check the drip tray and empty if necessary.  An indicator pop-up center button rises when full. 

 
Quarterly:  

  Inspect all fittings and hoses for leaks. 

  Inspect inside of tank for lime deposits. De-lime tank and probes if necessary. This procedure should 

be performed by a qualified service technician 
Notice:  

  Turn off power to the HWD-2110 before any cleaning procedure, including wiping the exterior for 

appearance reasons.  Dry the exterior, especially the face panel, before turning on power. 
 

WARNING:  

 

Do not apply any type of spray cleaner on the face panel of this equipment. 

 

Never use any solvent based cleaner or polish on this equipment.

  

 

Dry the face of the HWD-2110 before turning on power. 

 

WARNING-Do not energize this equipment or attempt to operate without all covers in place 
and all screws fastened. 

 

 

 

 
   Tank Drain 

   The water tank must be drained before maintenance procedures, and when the unit is to be relocated or shipped. 
 

1. Disconnect power to the unit. 
2. Move the unit near a sink or obtain a container to large enough to hold four gallons of water. 
3. Remove the tank cover and allow the tank to cool to a safe temperature. 
4. The tank drain is located on the back of the unit. Turn the drain plug one-quarter turn in either direction. 
5. Pull the plug out far enough to expose the silicone tube. 
6. Using pliers loosen the hose clamp and move it back over the tube. 
7. Crimp the tube an inch or two away from the drain plug to prevent water from flowing. 
8. Use the other hand to pull the drain plug out of the tube. 
9. Release the crimped tube and allow the water to flow into the sink or container. 

 

 

 
 

Summary of Contents for HWD-2110 TOD

Page 1: ...US patents applied for FETCO is a trademark of Food Equipment Technologies Company 2011 Food Equipment Technologies Company November 2011 NOTICE TO INSTALLER Please leave this book with the machine Us...

Page 2: ...ate per hour based on 65 70 F 18 21 C mains water supply temperature at lowest possible electrical supply current Factors affecting temperature accuracy include quantity of hot water dispensed ambient...

Page 3: ...should be installed after the water shutoff valve and in a position to facilitate filter replacement 5 Flush the water supply line and filter before connecting it to the unit 6 Verify that the water l...

Page 4: ...dispensed in succession 6 Unit returns to inactive Enabled Screen if no water is dispensed in 3 seconds 7 Steam and condensation from the water tank is released into the vent whenever the unit is on...

Page 5: ...rvice technician Notice Turn off power to the HWD 2110 before any cleaning procedure including wiping the exterior for appearance reasons Dry the exterior especially the face panel before turning on p...

Page 6: ...wo to three 2 3 seconds The upper white selector pad will light when selected temperature is ready Touch and hold lower red pad to dispense hot water Maximum single dispense is 24ounces 700cc in 15 se...

Page 7: ...Setting F Boiling point F 500 207 212 9 0 207 212 0 500 207 211 1 1000 205 210 2 2000 204 208 4 2500 203 207 5 3000 200 206 6 3500 197 205 7 4000 195 204 8 4500 194 203 9 5000 194 203 0 5500 193 202 0...

Page 8: ...8 HWD 2110 DOMESTIC Wiring diagram...

Page 9: ...9 HWD 2110 EXPORT Wiring diagram...

Page 10: ...240VAC 1 2 1059 00001 00 TRIAC 40A 600V 1 3 1053 00004 00 THERMOSTAT SINGLE SHOT 25A 1 4 1024 00007 00 O RING DASH 344 TANK COVER 1 5 1102 00007 00 TANK COVER ASSEMBLY 1 6 1054 00006 00 FILL SENSOR HW...

Page 11: ...11 Drawing 1109 00033 00 HWD 2110 Service Parts...

Page 12: ...D 2100 1 13 1029 00023 00 FITTING SINGLE BARBED ELBOW 1 4 KYNAR 1 14 1052 00010 00 TERMINAL BLOCK 3 POLE 30 AMP 10 22 AWG 1 15 1057 00043 00 SOLENOID VALVE SINGLE 180 DEG 24VDC 1 16 1058 00020 00 SWIT...

Reviews: