20
Final Setup for Startup
FETCO Home Screen #1 “FILLING”
Home Screen #2 “HEATING”
Final Setup
1. Turn on incoming water supply line and carefully inspect both inside and
outside of the brewer for leaks in all fittings and tubes
2. Turn on power.
3. Press the brewer’s main power switch (located on the lower right of the back
of the equipment)
SCREENS SHOWN TO THE RIGHT WILL APPEAR
4. The water tank will begin filling. FETCO Home Screen #1 will read
“FILLING”.
5. When the water level rises and is sensed by the probe at the top of the tank
the heaters will activate
6. Heaters are automatically disabled until the tank is full.
7. While the water is heating Screen #2 “HEATING” will display and the actual
water temperature will be displayed.
P
8. After the water has reached the set temperature Screen #3 will display
“READY”
9. Review the Operating Instructions. Brew one full batch (water only) on each
side to confirm proper fill levels. The brewer is factory set with water only (no
coffee) to dispense the correct amount of water. If the actual volume is
slightly different from the programmed volume, fine-tuning the brewer may
be necessary. See Calibrate Valves in the OUTPUT section in the
PROGRAMMING section.
10. Re-attach the covers after one final inspection for leaks. Look closely in the
top of the brewer section at the dispense fittings during this inspection.
FETCO Home Screen #3 “READY
CBS_2132 3L
Ready Touch
Heating screen
Filling to unlock
™
XTS
™
EXTRACTOR
TOUCHSCREEN
CBS_2132 3L
Ready
Tank Temp
°F
Heating
197
Filling
™
XTS
™
EXTRACTOR
TOUCHSCREEN
CBS_2132 3L
Ready Touch
Heating screen
Filling to unlock
™
XTS
™
EXTRACTOR
TOUCHSCREEN