7.1

Preparing commissioning

1. Pressurise the system.
2. Set an operating pressure of at least 0.4 MPa (4 bar, 58 psi).
3. Perform a functional test 

è

 7.2 Performing functional test.

7.2

Performing functional test

1. Make sure that there is an operating pressure of at least 0.4 MPa (4 bar, 58 psi) at the two

pushbutton valves.

2. Pressurise the inlets (1

1

) and (1

2

) according to the signal sequence shown in the figure below

è

 Fig. 3.

3. At each step, check whether the outlet (2) responds as in the following figure 

è

 Fig. 3.

The time offset between the inlet signals (steps 7 and 8) must be no more than 0.5 s.

Fig. 3: Functional test, step 1 … 15

The maximum permissible time offset between the inlet signals (1

1

) and (1

2

) (step 7 and 8) depends

on the operating pressure and the ambient temperature. The higher the operating pressure and
ambient temperature, the smaller the time offset needs to be.

8

Operation

8.1

Checking operational reliability

1. Perform the functional test monthly 

è

 7.2 Performing functional test.

2. Keep a record of the results of the functional tests.

Summary of Contents for ZSB-1/8-B

Page 1: ...ZSB 1 8 B Control block for two hand start Operating instruc tion 8166273 2022 08c 8166275...

Page 2: ...Translation of the original instructions...

Page 3: ...ring approval 5 3 Additional information 5 4 Product overview 6 4 1 Product design 6 4 2 Function 6 5 Assembly 7 5 1 Mounting 7 6 Installation 7 6 1 Pneumatic installation 7 7 Commissioning 8 7 1 Prep...

Page 4: ...ct labelling example 1 3 Specified standards Version ISO 8573 1 2010 04 EN ISO 13849 1 2015 12 EN ISO 13851 2019 04 EN ISO 13849 2 2012 10 EN 60068 2 27 2009 05 Tab 2 Specified standards 2 Safety 2 1...

Page 5: ...oduct may only be carried out by qualified personnel who can evaluate the work and detect dangers The qualified personnel have skills and experience in dealing with pneumatic open loop control technol...

Page 6: ...for two hand start is a pneumatic AND gate If pneumatic signals are sent to the inputs 11 and 12 with a maximum time delay of 0 5 seconds an output signal is sent at the outlet 2 The control block fo...

Page 7: ...holes hole spacing 40 mm or via the fastening threads hole spacing 38 mm 3 Install two 3 2 way pushbutton valves Fig 2 6 Installation 6 1 Pneumatic installation Requirement Use hoses with the same nom...

Page 8: ...the figure below Fig 3 3 At each step check whether the outlet 2 responds as in the following figure Fig 3 The time offset between the inlet signals steps 7 and 8 must be no more than 0 5 s Fig 3 Fun...

Page 9: ...tional test Component Cleaning supplies Cleaning interval Housing Water maximum 60 C If required Screw with filter element Compressed air Water maximum 60 C Petroleum ether every six months or after 1...

Page 10: ...Product weight g 420 Operating pressure1 MPa 0 4 0 8 bar 4 8 psi 58 120 Standard nominal flow rate l min 50 Ambient temperature 2 C 0 60 Nominal width mm 4 Actuation type Pneumatic Mounting position A...

Page 11: ...the medium otherwise moisture in the expanded compressed air will freeze 2 The higher the operating pressure the lower the maximum offset time Tab 8 Characteristic pneumatic values 12 3 Safety engine...

Page 12: ...ture of the valve housing Breakage of moving component Type of two hand control Type III A according to EN ISO 13851 Design features Overlap Mechanical spring return Poppet valve with spring return 1...

Page 13: ...ve the operating time T10D in accordance with EN ISO 13849 1 C 3 of the control block for two hand start The operating time is a function of the service life characteristic B10D and the average number...

Page 14: ...2022 all rights reserved to Festo SE Co KG Copyright Festo SE Co KG 73734 Esslingen Ruiter Stra e 82 Deutschland Phone 49 711 347 0 Internet www festo com...

Reviews: