![Festo YXCA Operating Instructions Manual Download Page 31](http://html1.mh-extra.com/html/festo/yxca/yxca_operating-instructions-manual_2283589031.webp)
Festo — YXCA — 2021-07
Assembly
31
6.5.3
Mounting Z-module
6.5.3.1
Mounting Z-module DHMZ-DGST on Y-module EHMY-...-ELGC
Requirements:
–
The Y-module is mounted.
–
The moving parts are secured with the transportation locks.
Fig. 20: Mount Z-module DHMZ-DGST, example
1. Press the centring sleeves into the holes of the Y-Z adapter plate on the Y-module.
2. Place the Z-module on the Y-Z adapter plate of the Y-module.
3. Fasten the Z-module to the Y-Z adapter plate with at least 2 screws through the housing. Secure
the screws with an adhesive for locking screws.
DHMZ-DGST-
8
12
16
EHMY-AS-ELGC-
45
45/60
60
Screw size
M3 x 20
M4 x 30
M5 x 30
Tightening torque
[Nm]
1.2
2.4
4.8
Removing transportation locks
Fig. 21: Identification of the transportation lock for moving parts
•
On the product, remove all marked transportation locks from the moving parts.