1. Installation
1-3
Festo P.BE-CP-CO2-EN en 0107NH
1.1
General instructions on installation
Warning
Before carrying out installation and maintenance work,
switch off the following:
– the compressed air supply
– the operating voltage for the internal logics
– the load voltage for the valves.
You can thereby avoid:
–
uncontrolled movements of loose tubing
–
unexpected movements of the connected actuators
–
non-defined switching states of the electronic compo-
nents.
Caution
The CPV valve terminal with field bus direct connection
(CPV Direct) contains electrostatically sensitive compo-
nents.
– Do not therefore touch any contacts.
– Observe the regulations for handling electrostatically
sensitive components.
You will then prevent the electronics from being damaged.
Summary of Contents for CP-A08...-M12 Series
Page 2: ......
Page 4: ...Contents and general instructions II Festo P BE CP CO2 EN en 0107NH ...
Page 8: ...Contents and general instructions VI Festo P BE CP CO2 EN en 0107NH ...
Page 14: ...Contents and general instructions XII Festo P BE CP CO2 EN en 0107NH ...
Page 15: ...Installation 1 1 Festo P BE CP CO2 EN en 0107NH Chapter 1 ...
Page 55: ...Commissioning 2 1 Festo P BE CP CO2 EN en 0107NH Chapter 2 ...
Page 83: ...Diagnosis 3 1 Festo P BE CP CO2 EN en 0107NH Chapter 3 ...
Page 100: ...3 Diagnosis 3 18 Festo P BE CP CO2 EN en 0107NH ...
Page 101: ...Technical data and accessories A 1 Festo P BE CP CO2 EN en 0107NH Appendix A ...
Page 106: ...A Technical data and accessories A 6 Festo P BE CP CO2 EN en 0107NH ...
Page 110: ...A Technical data and accessories A 10 Festo P BE CP CO2 EN en 0107NH ...
Page 111: ...Examples B 1 Festo P BE CP CO2 EN en 0107NH Appendix B ...
Page 118: ...B Examples B 8 Festo P BE CP CO2 EN en 0107NH ...
Page 119: ...Index C 1 Festo P BE CP CO2 EN en 0107NH Appendix C ...
Page 120: ...C Index C 2 Festo P BE CP CO2 EN en 0107NH Contents C Index C 1 ...