4.3 Reaction of the CP system when switched on
When the voltage supply is switched on, the node as-
certains the current string assignment automatically. It
ascertains, one after the other, which CP modules are
connected to which strings.
If the current assignment corresponds to the saved as-
signment, the fieldbus node will switch immediately to
ready status. The status LEDs on the modules will then
light up, thereby indicating readiness to operate (see
Fig. 4/2).
If the current assignment does not correspond to the
saved assignment, the LED of the relevant string will
flash on the fieldbus node. The status LEDs on the mo-
dules will also flash. In this case, the CP system is not
ready to operate.
PLEASE NOTE
If several strings do not match, their string LEDs will
flash one after the other.
4. Commissioning
4-8
CP... 9806A
Summary of Contents for Compact Performance System
Page 1: ...Compact Performance CP system Installation and commissioning...
Page 3: ...Part no 165 226 Title Manual Designation P BE CPSYS GB II CP 9806A...
Page 12: ...Chapter 1 System overview 1 System overview CP 9806A 1 1...
Page 33: ...1 System overview 1 22 CP 9806A...
Page 34: ...Chapter 2 Fitting 2 Fitting CP 9806A 2 1...
Page 46: ...Chapter 3 Installation 3 Installation CP 9806A 3 1...
Page 64: ...Chapter 4 Commissioning 4 Commissioning CP 9806A 4 1...
Page 82: ...Appendix A Technical appendix A Technical appendix CP 9806A A 1...
Page 91: ...V Voltage connecting 3 14 selecting the cable 3 16 A Technical appendix A 10 CP 9806A...