![Festo 8129208 Operating Instructions Manual Download Page 30](http://html1.mh-extra.com/html/festo/8129208/8129208_operating-instructions-manual_2283914030.webp)
Single-Phase Energy Measurement Box – Operating Instructions
30
© Festo Didactic
8130877
9.3
Network connection
1.
Insert network cable into the connector socket "LAN".
2.
If necessary, connect the network cable with the Ethernet interface of a PC via a switch.
The interface must have an IP address in the same sub-network, e.g. 172.21.0.91
10
Scope of delivery
Quantity
Order no.
Designation
1
8129208
Single-phase energy measurement box
1
8130877
Operating instructions
3
8027739
Non-heating appliance extension cables, order number
1
8027279
Network cable
2
153367
Push-in T-connector 6 mm
3
153032
Straight plug connector 6 mm
11
Accessories
Network connection cable with plug in accordance with
Plug type
Countries (code)
Order numbers
CEE 7/VII
DE, FR, NO, SE, FI, Pt, ES, AT, NL, BE, GR, TR, IT, DK, IR, ID
247661
NEMA 5-15
US, CA, BR, CO, EC, KR, TW, TH, PH, JP
350362
BS1363
GB, IE, MY, SG, UA, HK, AE
350363
AS 3112-1981
AU, NZ, CN, AR
350364
SEV 1011
CH
350366
SANS 162-1
ZA, IN, PT, SG, HK, (GB), (AE)
350367
Subject to change
Multi-socket strip with 3x CEE 7/VII terminal sockets as well as IEC connection plug
Order number: 8072997
WARNING
Network cables are not allowed to be replaced by inadequately measured network
cables.
Cable type must correspond to H05VV-F3G1.0mm² or SJT3x18AWG.
Maximum length 2.5m