![Festo 8129208 Operating Instructions Manual Download Page 16](http://html1.mh-extra.com/html/festo/8129208/8129208_operating-instructions-manual_2283914016.webp)
Single-Phase Energy Measurement Box – Operating Instructions
16
© Festo Didactic
8130877
CAUTION
•
Setting up pneumatic circuits
–
Connect the components with plastic tubing with an outside diameter of 4 or
6 mm.
–
Push the pneumatic tubing into the push-in connector as far as it will go.
•
Dismantling pneumatic circuits
–
Switch off the compressed air supply before dismantling the circuit.
–
Press the blue release ring down so that the tubing can be pulled out.
•
Noise due to escaping compressed air
–
Noise caused by escaping compressed air may damage your hearing. Reduce
noise by using mufflers, or wear hearing protection if noise cannot be avoided.
–
All of the exhaust ports of the components included in the equipment set are
equipped with mufflers. Do not remove these mufflers.