![Ferroli Rendimax 16 CE Installation And Operating Instructions Manual Download Page 12](http://html.mh-extra.com/html/ferroli/rendimax-16-ce/rendimax-16-ce_installation-and-operating-instructions-manual_2282096012.webp)
12
S.p.A.
5.02 Check and gas pressure regulation
Gas Valve ELETTROSIT
The regulation of gas pressure at the pilot burner has to be done at sight, without instrument but
checking the that flame envelope completely the thermocouple (fig. 10) without burning excessive
gas.
To adjust the pilot flame operate as follow:
To decrease the gas flow rate rotate clockwise the screw PILOT ADJ .
To increase the gas flow rate rotate anticlockwise the screw PILOT ADJ.
To adjust the pressure at main burner, remove the protection cap and rotate the screw REG. ADJ (fig.
6) clockwise to increase the pressure and anticlockwise to decrease.
ATTENTION:The pressure measured at point 1 and 5 (fig. 5) has be read after 30 second and after the
pressure adjustment.
5.03 Adjusting min. flow on slow-opening for N.G.
Gas Valve ELETTROSIT
5.03.1 System nr.1
loosen completely the screw “REG ADJ” (fig. 6)
Operate the screw “1 STEP ADJ” (fig 6) until the main burner light-on gradually and noiseless.
Adjust the screw “1 STEP ADJ” until the gas pressure is the right one.
Seal the screws “1 STEP ADJ” and “REG ADJ”.
5.03.2 System nr.2
(In the even the screw “REG ADJ” is already adjusted and sealed.
Tighten the screw “1 STEP ADJ” (fig. 6)
Operate the screw “1 STEP ADJ” (fig 6) each time for 1/4 anticlockwise.
After rotation switch over the “Pilot” position by means of button 2 (fig. 6). After 30-60 sec switch
over again on “Operation” position by means the button nr. 3 (fig. 6).
Repeat the previous operations until the main burner light on gradually and noiseless and than seal
the screw “1 STEP ADJ”.
5.04 Adjusting min. gas flow on slow-opening for L.P.G.
Gas Valve ELETTROSIT
Take out the protection cap and check that the screw “NO PR” (fig. 6) is rotate clockwise completely.
Adjust the screw “REG ADJ” until the main burner gas pressure is 12 mbar.
Loosen the screw “NO PR” (fig. 6)
Adjust the min. gas flow on slow-opening as described on par. 5.03.02 (System nr. 2).
Loosen the screw “PILOT ADJ” (fig. 6).
Seal the screws “1STEP ADJ” , “REG ADJ”.and “PILOT ADJ”.
ATTENTION:The screw “NO PR” has not to remain on intermediate position.It has to be completely
tighten with N.G.and loosen with L.P.G.
Summary of Contents for Rendimax 16 CE
Page 19: ...19 S p A...