
BOILER REPLACEMENT: OPTIMAX 25C TO MODENA 32C HE
Fig.6
5.
Lay the boiler on its back. Remove the front casing
panel by undoing the two securing screws on the
underside of the case. Ease the lower edge of the
panel forward to clear the controls display and lift
upwards off the frame.
6.
Lift the boiler onto the hanging bracket making
sure the lugs on the bracket locate correctly with
the two support brackets on the boiler frame (Fig. 6)
FOR STANDARD HORIZONTAL TELESCOPIC FLUE INSTALLATIONS
UNPACK THE NEW TELESCOPIC FLUE KIT:
CODE - 041049G0
7.
Remove the protective adhesive cover from the top of the boiler to expose the flue/fixing holes.
Secure the new appliance flue bend to the top of the boiler using the screws and gasket provided
8.
Level
8. From the outside, push the flue
terminal
length
through
the
existing hole in the building fabric
and align with the appliance bend.
Lubricate the seal with a suitable
silicone grease and push the flue
pipe fully into the into the
appliance bend.
Ensure the flue terminal is fitted
level.