EN
4. INSTALLATION OF GPA-II SERIES PUMP
4.1. Installation
• Install GPA-II series motor pump, with arrows indicating the direction of medi-
um flow.
• Install two gaskets must be set at the inlet and the outlet before installing the
pump in the pipeline.
• Pump shaft must be positioned horizontally.
1
1
2
2
3
3
4
4
5
6
4.2. Position of Junction Box
4.3. Changing the position of Junction Box
The junction box can be rotated in intervals 90°
To change the position of the junction box:
1. Close the inlet and outlet valve, depressurize the equipment
2. Loosen and remove four hex screws fixed the motor.
3. Rotate the motor to the desired position and match the openings.
4. Put the four hex screws into the openings and turn clockwise.
5. Open the inlet and outlet valve.
1
2
3
4
Summary of Contents for 0607W
Page 82: ...RU GPA II 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19...
Page 83: ...RU 20 8 1 O 2 2 1 GPA II GPA II GPA II GPA II...
Page 86: ...RU 1 4 5 2 3 4 2 4 3 90 1 2 3 4 5 1 2 3 4...
Page 88: ...RU 6 6 1 7 7 1 1 2 3 4 1 2 3 4 3 GPA II 1x230 V 50 60 Hz 6 10 7 8 A...
Page 89: ...RU A B C B C GPA II 10 1...
Page 90: ...RU L 8 2 1 2 10 8 1 8 Q Q Q BYPASS AUTO Q min 1 3 2...
Page 91: ...RU 8 3 1 2 10 9 9 1 3 9 2 GPA II GPA II 9 3...
Page 97: ...RU 1 FERRO S A Ferro 24 2 3 4 FERRO 5 6 7 8...
Page 114: ...BG GPA II 1 2 3 4 5 6 7 8 9 10 11 12 13 0 14 15 16 17 18 19 20 8...
Page 115: ...BG 1 2 2 1 GPA II GPA II GPA II 2 2 GPA II e GPA II EEL e 0 23 0 20...
Page 117: ...BG 4 GPA II 4 1 GPA II 1 1 2 2 3 3 4 4 5 6 4 2 1 2 3 4 4 3 90 1 2 4 3 4 4 5...
Page 119: ...1 2 3 4 BG 3 GPA II 1x230 V 50 60 Hz 6 10 7 8 6 6 1 1 2 3 4 4 5 6...
Page 120: ...BG A B C A B C GPA II 10 1 7 7 1...
Page 121: ...BG 8 1 8 L 8 2 1 2 10 8 3 1 Q Q Q BYPASS AUTO Q min 1 3 2...