Not for
Reproduction
4
3
1. Remove the ground speed control levers and mounting
hardware from the handle bar box.
2. Install the ground speed control levers (A & B) onto the
control lever base using the hardware (E) supplied in the
box. Prior to tightening the bolts, align the handles with
each other.
Install the Seat
This procedure is only necessary if the seat is not factory-
installed on your unit.
Some models are equipped with two sets of holes in the
seat plate that the seat can be installed in. Use the forward
set of holes to position the operator closer to the front of the
machine and the rear set of holes to position the operator
towards the rear of the machine. Determining what holes
to use is based on the preferred operating position of the
operator.
1. Unpack the seat.
2. Install the seat (A, Figure 4) onto the seat mount plate (B)
and secure with the 5/16 nylock flange nuts (C).
4
3. Connect the wire harness (D) to the seat switch (E) that is
located in the bottom of the seat.
Assemble the Roll Bar Retainer Pins
1. Unpack the roll bar and hardware from the box.
2. Lock the snap end (A, Figure 5) of the lanyard (B) through
the retainer pin handle (C) and snap together.
5
3. Install the lanyard anchor (D) onto the lanyard.
4. Install the hair pin (E) onto the loop end (F) of the lanyard
as shown in Figure 5.
Install the Roll Bar to the Unit
The roll bar assembly is installed in the roll bar pockets which
are part of the main frame of the unit and are located behind
the seat and in front of the engine on both sides of the unit.
1. Assemble the top loop (A, Figure 6) to the left upright
tube (B) and the right upright tube (C) by loosely installing
the 1/2 bolt (D), through the retainer pin assembly (E),
then through the hole in the top loop that is closest to the