6. STANDARD INSTRUMENT PANEL
6.1 Pannel
(Fig. 13)
The instrument panel supplied, made from pla-
stic with index of protection IP40, holds the con-
trol and safety instruments.
The boiler electrical system must be:
- designed and made by qualified personnel
and connected to an earth system in
compliance with the legalisation in force.
- suitable for the maximum power input of the
boiler, using cables with an adequate cross-section.
The earth wire in the power cables and connec-
tion cables to the burner must be a few mm lon-
ger than the other wires in the same cable. For
the connections between the burner, the electri-
cal panel and the power supply, use H07 RN-F
cables for installation in view. For other types of
installation or special environmental conditions,
refer to the legislation in force. The composition
and the diameter of the wires should be calcula-
ted based on the power input of the burner. To
access the instruments, rotate the front panel
(A). To access the terminal block and unwind
the capillary tubes from the thermostats and the
thermometer, remove the top panel (B), after
having unscrewed the 2 side screws (C). The
control thermostats (12-13 - Fig. 16) can be set
by the user, using the knob at the front. The
safety thermostat has a fixed setting and
manual reset, as specified by Italian Min.
Decree 1/12/75, collection R.
The following are compulsory:
- the use of a two-pole thermal-magnetic over-
load switch, mains disconnecting switch, com-
pliant with the CEI-EN standards (minimum
contact opening 3 mm)
- observe the polarity L1 (Phase) - N (Neutral)
- use cables with a minimum cross-section of
1.5 mm, complete with pointed end terminals.
- refer to the wiring diagrams in this booklet for
any operations on the electrical system.
- connect the appliance to an effective earth
system.
- the water pipes must not be used to earth the
appliance.
The manufacturer is not liable for any damage
due to the failure to earth the appliance and to
observe the information provided on the wiring
diagrams.
A connection point is provided on the front head
for earthing the boiler body.
6.2 Panel front view
(Fig. 14)
Key
1
Pump ON switch
2
Burner ON switch
3
Boiler ON switch
4
Test button
5
Safety pressure switch reset button
6
Boiler water temperature
7
Boiler on LED
8
1
st
burner flame LED
9
2
nd
burner flame LED
10
Burner shutdown LED
11
Safety pressure switch LED
12
2
nd
boiler flame control thermostat TR1
13
1
st
boiler flame control thermostat TR1
14
Space for temperature controller
6.3 Diagram of the terminal block electrical
connections
- 19 -
GB
L
N
Control panel power supply
3
Burner power supply
4
5
1
st
stage thermostat
6
7
2
nd
stage thermostat
8
9
Lockout light
10
2
nd
stage operation light
11
System pump power supply
12
13
Boiler remote on
14
(if present, otherwise jumper)
15
Boiler remote safety alarm
16
(if present, otherwise jumper)
17
Room thermostat
18
L
N
4
5
6
7
8
9
10
3
11
12
13
14
15
16
17
18
e
mpianto
ota
are)
ta
are)
B4 S3
T2
T1 N
L1
T8 T7 T6
B5
Summary of Contents for TP3 LN
Page 1: ...TP3 LN Caldaie ad Altissimo Rendimento Very high efficiency boilers ...
Page 2: ......
Page 115: ...Fig 4 Fig 5 ...
Page 116: ...Fig 6 Fig 7 3 5D D Fig 8 ...
Page 117: ... Fig 10 L A Fig 9 L A ...
Page 119: ...Fig 13 C B A C Fig 14 5 4 3 2 1 14 13 12 6 7 8 10 11 9 Fig 16 ...
Page 120: ... Fig 17 1 2 3 5 4 5 ...
Page 121: ...Fig 18 Fig 19 ...
Page 122: ......
Page 123: ......