11
11
ENGLISH
4. HOW TO USE
1. Place the lifting tower over a firm and flat
surface on its working place.
2. Release the metal knob (W), open the sa-
fety pin (V) and pull out until it is adjusted
to the desired height. The outriggers can be
set in two different positions. Retighten the
metal knob (W).
3. Put the load on the top of the lifting tower
using the suitable support, in order to make
the load work only vertically. The minimum
load must be 25kg.
4. Elevation: To lift the bars, follow a descen-
ding order, that is to say, the first bar to be
lifted will be always the highest one. Relea-
se the plastic knob (C) and turn the winch
handle (B) clockwise, lifting the load until
the desired height. Once the lifting tower is
at the desired height, adjust the plastic knob
(C). In case of the lifting tower does not need
to be raised to its maximum height, it is re-
commended to raise all bars proportionally
according to the height, and not only one of
them.
5 Lowering: Follow an ascending order to
lower the bars, that is to say, the first bar to
be lowered will be always the lowest one. Re-
lease the plastic knob (C) and turn the winch
handle (B) counterclockwise until lowering
the lifting tower to its folded height.
6. For the lifting tower transport, it is neces-
sary to bring down all bars and secure them
by tightening all plastic knobs (C). Release
the metal knob (W) and fold the outriggers
releasing the safety pin (V) and push up until
the folding position is reached. Retighten the
metal knob (W).
Summary of Contents for NEMESIS 110
Page 14: ...14...
Page 15: ...15...
Page 16: ...16...
Page 17: ...17...
Page 18: ...18 NOTAS NOTES LIFTING TOWERS...
Page 19: ...19 NOTAS NOTES LIFTING TOWERS...