19
FELTON DIGITAL
OPERATIONAL TESTING:
1
Ensure that the TLC 30 FTD is installed correctly and connected to the power supply.
The installed system should be operated to check for leaks.
2 Open
Push the
Smartview™
Interface once.
The TLC 30 FTD unit opens and the LED illuminates.
3 Close
Push the
Smartview™
Interface again.
The TLC 30 FTD unit closes and the LED goes off.
The installed system should be operated to check for leaks.
Summary of Contents for SMARTVIEW FD-SVCSMC
Page 1: ...1 FELTON DIGITAL INSTALLATION GUIDE SMARTVIEW Digital Thermostatic Shower Mixer FD SVCSMC...
Page 2: ...2 SMARTVIEW INSTALL GUIDE...
Page 4: ...4 SMARTVIEW INSTALL GUIDE...
Page 22: ...22 SMARTVIEW INSTALL GUIDE...
Page 23: ...23 FELTON DIGITAL 8 x 55 8 x 55 this side up this side up 235mm SMARTVIEW PROCESSOR TEMPLATE...