Metal Core Drilling
34130550060
Printed in Germany
Assembly
C-SC_CSSM
Version 1.0
01.04.2021
Page
65
of
92
All rights reserved by FEIN, especially in case of property rights applications.
FEIN retains all rights of disposal, such as copying and circulation.
9.1.11 Positioning the control panel
3.
Connect all cables (
1
) as shown in the connection
diagram.
4.
Position the cover (
2
).
5.
Position the holder (
3
).
6.
Screw in the two screws [4x48] (
4
) [2.0
±0.3 Nm
].
7.
Screw in the two screws [4x18] (
5
) [2.0
±0.3 Nm
].
8.
Screw in the two screws [4x48] (
6
) [2.0
±0.3 Nm
].
4
3
2
4
5
6
2